Gabbs Town Advisory Board, Nye County: meeting of April 9, 2014

193 turns, 0 with a named speaker, under 15 agenda items. The words and the names are the county clerk's.

Attendance

Date 04/09/14

Pursuant to NRS, the Gabbs Advisory Town Board met in a regular session at 6:30 p.m. at the Gabbs Townhall, Gabbs, Nevada.

Janice Lyman, Chair Calvin Higbee, Vice-Chair Joseph Hendrick, Member Kenneth House, Member John Meyer, Member

Also Present: Lorina Dellinger, Administrative Manager; Susan Paprocki, Comptroller; Jack Osburn, Utilities Superintendant

2. ROLL CALL

All present.

3. GENERAL PUBLIC COMMENT.

Jack Osburn stated he was sorry he didn’t attend the last meeting, he was indisposed. He stated he heard there were some comments regarding the recent work at the VFW Hall. He stated the service line had backed-up and the work to replace the line stalled for the lack of a backhoe. He stated at the February meeting the board asked Public Works for assistance and he said he would check in to it. He stated at the same meeting the mine offered their backhoe to do the work and the board accepted that offer. He stated that after two weeks the mine hadn't shown up and completed the work so he got tired of the quarrelling that was going on. He stated he got a crew up here and they completed the work. He stated he contacted his supervisors as well as the Department of Environmental Protection and working under the county’s responsibility for the safety and welfare of the community, they opened up the trench. He stated the VFW personnel and volunteers placed the line; the county used that opportunity at the right-a-way line to install a cleanout, which was county policy. He stated if the county wished to recover any of the cost for protecting the safety and welfare of this community, they would charge the appropriate parties.

Joseph Hendrick stated they appreciated it and thanked him.

4. FOR POSSIBLE ACTION - APPROVAL OF THE AGENDA FOR THE GABBS

ADVISORY BOARD’S MEETING OF APRIL 9, 2014.

Kenneth House made a motion to approve the agenda for the Advisory Board meeting on April 9, 2014; seconded by John Meyer; 5 ayes.

Date 04/09/14

5. FOR POSSIBLE ACTION - APPROVAL OF MINUTES OF THE ADVISORY

BOARD’S MEETING(S) ON MARCH 12, 2014.

Kenneth House made a motion to approve the minutes of the board meeting on March 12, 2014; seconded by Calvin Higbee; 5 ayes.

6. FOR POSSIBLE ACTION — EMERGENCY ITEMS.

No emergency items.

7. BOARD MEMBER’S COMMENTS.

Janice Lyman stated they had the old metal garbage bins in the yard and some other scrap metal and she wondered if they could sell it to the scrap metal people and put the money in the town fund.

Scott McLean stated they could.

8. REPORTS

a. TOWN SECRETARY’S REPORT

Reyna Martin read the following report.

MONTHLY SECRETARY REPORT

DATE

UTILITY Total Water _ 1,053,100 (Gal) pumped between Feb 18 & Mar 17 Total Water 645.646 (Gal) billed between _Feb 20 & Mar 18 Total Water 535,190 (Gal) Difference Leaks detected/reported 0 Leaks repaired 0 Utility work orders issued during __ March = 6

Utility work orders closed during __ March 6

Date 04/09/14

TOWN SECRETARY’S REPORT - cont.

SANITATION Sanitation work orders issued during March = 7 Sanitation work orders closed during March = t

ADMINISTRATION

March Statements sent: = 127 Month New accounts = 1 Closed accounts= 4

Reyna Martin reviewed the current fiscal budget revenue and expenditures as of March 31, 2014.

Calvin Higbee stated that Jack had indicated that there was going to be work done on the water lines in town during the summer.

Jack Osburn stated it was going to be the wastewater lines.

b. UTILITY OPERATOR’S REPORT

Scott McLean stated last month he received a certification from the ABPA, American Backflow Prevention Association to test the backflow assembly. He stated that this month he received a Flagger’s Certification and Confined Space training both through Nye County. He stated that he lost his volunteer, Daniel, because he went to work at Reese River and he was in the process of finding another volunteer. He stated he had been talking to Jon Seeger. He stated he was trying to get his application turned in so Jon could help with small water projects.

Calvin Higbee asked if Scott was still a Certified Pool Operator.

Scott McLean stated he was.

Joseph Hendrick asked about the total water differences and where did it go.

Reyna Martin stated part of the missing water was because they still had many old meters. She stated that as they got older they did slow and not register all the flow and

that was part of the problem. She stated they had been replacing meters but due to the lack of funds in the new budget they would not be able to afford replacing any more

3

Date 04/09/14

UTILITY OPERATOR’S REPORT

meters. She stated she was sure there were water leaks under the ground but until they bubbled up, there was no way to find them.

Scott McLean stated they had changed 50 meters out of 150 so they were still two- thirds away. He stated the school was one of the largest users and their meter was at nine million gallons and ready to turn over. He stated that was a meter they might need to budget and replace soon. He stated it was a four-inch meter and would cost around $4,000 between $7,000.

Susan Paprocki stated that could be a Capital Project.

9. CONSENT AGENDA ITEMS

a. FOR POSSIBLE ACTION - DISCUSSION OF ANY ITEM FROM THE CONSENT AGENDA THAT NEEDS REVIEW BEFORE A DECISION IS MADE.

No action taken.

b. FOR POSSIBLE ACTION — APPROVAL OF TOWN VOUCHERS.

Calvin Higbee stated he looked at the invoice for Western Nevada Supply and couldn’t tell what it was and assumed it was for office supplies.

Scott McLean stated it was for the wastewater cleanout at the VFW. Calvin Higbee asked about HACH.

Scott stated that was for ten milliliter test bottles for water.

Calvin Higbee asked about Blaine Equipment Company.

Reyna Martin stated that was for repairs on either the garbage truck or Public Works vehicles.

Scott McLean stated they were parts for the backhoe.

Kenneth House made a motion to approve the vouchers as presented; seconded by John Meyer; 5 ayes.

Joseph Hendrick stated he appreciated having Scott here to answer their questions.

Date 04/09/14

10. FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF OPTIONS

ON THE POOL AND POOL UPDATE.

Calvin Higbee stated the rationale for the pool was for the youth and a pool was an asset to any community. He stated their options were to replace the pool and he had looked at two grants that they had a chance for, with one being a really good chance for. He stated they were both matching fund grants. He stated the one from Parks and Recreation, the Federal Agency, had already been out and looked at our site and they were very pleased with what they saw. He stated they said we had a terrific chance to get the grant. He stated it was a pool inside of a pool, the new pool would be about 35 feet wide and 70 feet long with an average depth of four feet. He stated he had sent away all the measurements to two pool companies and hadn't received any responses back. He stated based on a bid received three or four years ago, they were looking at raising about $100,000 for a new pool. He stated that would be on us since the county was not going to participate in that. He stated they said that everything we did to the current pool to bring it up to ADA compliance or any other work on the pool could be part of our matching amount. He stated they could go into this in more detail at the forum on the third Monday of this month. He stated he would like to see a lot better turnout than they have had so they can have a hand count of who’s in favor of pursuing this. He stated either replace the pool, repair the existing pool and bring it into ADA compliance until we get a grant or a combination of the first two. He stated the fourth option was to bag the pool entirely. He asked for a show of hands on who would be in favor of bagging the pool entirely. He stated no one. He stated how about repairing the existing pool and making it do until it won’t do anymore and then forget about it.

Discussion continued from audience.

Calvin Higbee stated it was a clear majority so to spread the word, meet at the Fire Hall, and see if they could get a better feeling on how the rest of the community felt. He stated if the community said they wanted to go for a new pool and fix up the old one in the meantime, he would get that done. He stated he thought it was within reach.

Douglas Kasulka asked where he planned to get the $100,000 in matching funds.

Calvin Higbee stated the gal from the federal agency told him to invoice all of the volunteer labor. He stated he said at $75.00 an hour and she said sure. He stated he was going to keep track of every penny and that would to be a significant chunk of the $100,000. He stated he was going to ask Lorina Dellinger to make up the difference from personal funds.

Frances Hanifen asked if this was what the town wanted to do, then they could set up a separate account within the town; the pool fund. She stated if old residents wanted to make a donation to the new pool then that could go strictly into the pool fund.

Date 04/09/14

FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF OPTIONS ON THE POOL AND POOL UPDATE -— cont.

Susan Paprocki stated they had a donations line item in the General Fund for pool donations.

Lorina Dellinger the county would be the one applying for the grant through Amy Fanning. She stated on the matching funds that he explained any work being put into the pool would be an in-kind match. She stated that Jim as a Nye County employee, his time worked at the pool would be an in-kind match to getting the pool repaired. She stated if they broke up the pool repairs in two phases, getting the report cleared up should be the primary and then they could work on the ADA. She stated to work on getting the pool up to compliance with the report.

Calvin Higbee stated they were going to do both.

Lorina Dellinger stated she had an item on the agenda to talk about projects. She stated they should identify what needed to be done with the pool and it could be after their workshop regarding the pool, but they needed to approve the project. She stated they needed to identify a total amount and it could be an estimate. She stated as long as they had an approved project with an identified funding source and a scope of work, which they would need to apply for a grant that would get them going in the right direction. She stated that just doing a piece here and there wasn’t going to get them anywhere and might be more a waste of money.

Calvin Higbee stated the soonest they could apply for the grant they were going for wasn’t until January of next year. He stated the funds for 2015 were already gone, so if they got it they wouldn’t be funded until 2016. He stated that gave them lead time.

Lorina Dellinger stated it gave them time to put a plan together and the scope of work because a grant would need that.

Calvin Higbee stated that Amy was going to help them with all that.

Frances Hanifen asked about the donations.

Susan Paprocki stated if they wanted to make a donation to the pool it would go into the General Fund. She stated it would be used for the pool during the fiscal year the

donation was given and didn't rollover.

Discussion continued on when a donation should be given.

Date 04/09/14

FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF OPTIONS ON THE POOL AND POOL UPDATE - cont.

Lorina Dellinger stated donations had to go through the BOCC to be accepted but if people were only donating five or ten dollars, she recommended keeping a report and accepting the donation on a monthly basis.

Joseph Hendrick asked if donated hours could be charged against the $100,000. Lorina Dellinger stated she didn’t think volunteer hours could be.

Susan Paprocki stated they would have to know the intricacies of the grant because every grant was different. She stated that was why they had a Grant Administrator; she looked at every area of the grant to see where they could use in-kind matches rather than monetary matches.

Calvin Higbee stated he had talked with Amy before He stated the people he had talked to came out and looked at our site. He stated it was the Federal Recreation and Parks and they are the granting agency. He stated she said they could invoice donated labor according to whatever.

Janice Lyman stated Davis-Bacon.

Susan Paprocki stated as long as that was stipulated in the grant they could, but normally grants didn’t allow the use of volunteer hours.

Calvin Higbee stated he would make sure she worded it that way.

Lorina Dellinger stated if their short term goal was to get it open for the summer and man-hours were put into it, she didn’t believe they could wrap them up and apply them to a grant that the county hadn’t yet applied for.

Calvin Higbee stated they could, according to her if it was something that was not going change when the new pool went in. He gave the examples of a lifeguard chair, labor to make restrooms compliant and the parking pad for the handicapped. He stated they would invoice it all.

Susan Paprocki asked if Amy had reviewed any of the documentation for the granting agency regarding this grant. She asked if he had any documentation on it.

Calvin Higbee stated that detail came from the Federal Parks and Recreation people. He stated he would get back with Amy with the details because they gave him a lot of paperwork to read. He stated they didn’t give him the actual application.

Date 04/09/14

FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF OPTIONS ON THE POOL AND POOL UPDATE -— cont.

Joseph Hendrick stated to make sure it was in writing.

11. INFORMATION ON A TOWN FORUM ON MONDAY, APRIL 21 AT THE FIRE

HALL AT 4:30PM TO DISCUSS THE GABBS SWIMMING POOL.

Reyna Martin asked about this item.

Calvin Higbee stated they already covered it.

Kenneth House stated this was about the meeting at the Fire Hall.

Calvin Higbee stated it was to be advertised.

Lorina Dellinger stated that Vance Payne, the Emergency Services Director wasn’t aware that anybody wanted to hold meetings there and so she didn’t know if anybody had contacted him. She asked why they wanted to hold it at the Fire Hall.

Calvin Higbee stated they could hold it out in the street if that didn’t work.

Lorina Dellinger asked what was wrong with here where all the recording equipment was.

Calvin Higbee stated because it was not big enough.

Lorina Dellinger stated if there was no action that going to happen then it was a workshop regarding the pool. She stated it had to be noticed and minutes did have to be taken. She stated Brian Kunzi, the District Attorney, had asked her to make sure they were aware of that. She stated they needed to make sure that the set up was available wherever they were at and also Vance was concerned about holding it there because he wasn’t aware of it.

Calvin Higbee stated they could get a recorder somewhere.

Janice Lyman stated they could use this one.

Lorina Dellinger asked if they were sure that it was portable because if they were planning on having meetings at the Community Center eventually they would have to

move it.

Calvin Higbee asked if they needed to contact him.

Date 04/09/14

INFORMATION ON A TOWN FORUM ON MONDAY, APRIL 21 AT THE FIRE HALL AT 4:30PM TO DISCUSS THE GABBS SWIMMING POOL - cont.

Lorina Dellinger stated she recommended they did because he was concerned about having it there.

Calvin Higbee stated if he was concerned then they won't have it there. He stated they would hold it in the street.

Lorina Dellinger stated they could have it wherever they wanted as long as the address was on the notice.

Calvin Higbee stated to put down the address for the Senior Center.

Lorina Dellinger stated she believed that the day they have tentatively scheduled the meeting for, Reyna will not be here. She stated they needed somebody to record the meeting and take notes.

Calvin Higbee stated it could be anybody, right.

Lorina Dellinger stated that it could and they would have to transcribe the minutes because they would have to be approved at their meeting as well. She stated it was an official document and it is an official meeting.

Calvin Higbee stated so the minutes that were taken at the meeting had to be approved at the meeting.

Lorina Dellinger stated at their regular board meeting.

12. FOR POSSIBLE ACTION -— DISCUSSION AND DELIBERATION OF

ASSIGNMENTS GIVEN BY THE CHAIR TO ADVISORY BOARD MEMBERS.

Janice Lyman stated she had put a worksheet in with the projects that they have. She stated she thought if each one of them took an item and worked on that it wouldn’t be overtaxing any member of the board. She reviewed the following:

1. POOL Cal has been diligently working on finding a solution for our swimming

pool. Complete the paperwork for the Community Development Block Grant and the State Park Grant. 2. Ken Follow-up with Lorinda regarding transfer of Federal Lands to State Land. She is a member of the National Association of Counties and had offered to come and do a workshop for us on how these transfers occur and are processed. Set up a date for Lorinda to come to Gabbs for a workshop.

9

Date 04/09/14

FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF ASSIGNMENTS GIVEN BY THE CHAIR TO ADVISORY BOARD MEMBERS - cont.

3.Playground Apparatus Ken and Joe Ken was working with last board regarding the playground apparatus that is in the county yard. The mine has furnished the hardware and a pallet (I believe bags of cement). Finish the installation at the location you feel will have the most use. Either Park North or South Gabbs.

4. John Bylaws and Rules and Procedures. John originally presented the paperwork to Reyna to forward to the County Office to forward to the District Attorney for review. Please call to find the status and follow-up

5 Janice .Community Center Grand Opening Still planning on May 3rd Grand Opening Date. A representative from the U.S.D.A. Rural Development Department and a representative from Atom Splash the internet provider will be at the senior center on April 16th to answer any questions and give a sneak preview of the facility. Both of these are dependent upon the installation of the power by NV Energy.

Janice Lyman asked Ken to follow up on the playground equipment and get it going. She asked John to follow up on the Bylaws and Rules and Procedures and the video equipment and the security cameras. She asked if there was any information on the power at the Community Center.

Lorina Dellinger stated she had an update that she could give during General Public Comment.

Calvin Higbee asked what Ken’s second assignment was.

Janice Lyman stated that he and Joe are to get the playground equipment going. Joseph Hendrick stated fortunately he had been self-employed most of his life because he never did like to take orders from anybody. He asked if that wasn’t part of the town employee's duties to put the playground equipment together.

Janice Lyman stated he could certainly assist with it but the previous board had started the project and the mine had donated the hardware and concrete. She stated it was sitting in the yard and if he would follow up and coordinate, that was what they needed. She stated the county employee can definitely.

Calvin Higbee asked Jim if the concrete was still in the yard.

Jim Basinger stated it was.

John Meyer stated that they were trying to get a hold of Jim about getting in the

Community Center. He stated he guessed there was a work order to put a county lock on it.

10

Date 04/09/14

FOR POSSIBLE ACTION — DISCUSSION AND DELIBERATION OF ASSIGNMENTS GIVEN BY THE CHAIR TO ADVISORY BOARD MEMBERS - cont.

Lorina Dellinger stated she could address that during Public Comment and it was an update on what was happening with the Community Center.

Joseph Hendrick stated he felt that if he and Ken act on their own behalf he wouldn't want the liability if they got hurt or anything else like that. He stated being that the town employee was there, he was covered by Workman’s Comp. He stated if he slipped and broke a leg, he was out of business.

Lorina Dellinger stated they had to be careful that he wasn’t working out of class.

13. DISCUSSION REGARDING THE PROCEDURES FOR REQUESTING PROJECTS

INCLUDING BUT NOT LIMITED TO BUDGETING FOR PROJECTS, PROJECT RELATED TRANSACTIONS, AND POLICIES RELATED TO THE PURCHASING POLICY.

Lorina Dellinger stated this item was to give them some guidelines on the projects they were working on so they could accomplish their goals. She stated at the last meeting they discussed what the needs for the Community Center were. She stated they would bring that back to the board but as long as they had an overall project with an estimated cost, it was easier for the county. She stated when they were calling contractors to come out and give quotes and the county hadn’t approved the project or identified a funding source, it upset the contractors. She stated she wanted to make sure that when they had a project in mind they needed to put it on the agenda for them to discuss what it was they wanted to accomplish with the project. She stated they would hopefully come with some costs for the project and identify a funding source so that when the county called for quotes, we won't leave the contractors hanging. She stated they have had complaints from contractors in the past when the project hadn’t been approved first.

Calvin Higbee stated that was why at the pool he had only asked for estimates.

Lorina Dellinger stated it was really hard to get somebody out to a rural area and they deal with the same contractor a lot and were very grateful for that contractor. She stated they needed to identify what was needed and a ballpark figure of what it was going to cost without having somebody come out here and then not go anywhere with it. She stated to identify their funding source so that way they were that much more committed to that project. She stated they needed to utilize Judy Dodge, the Purchasing and Contracts Administrator because she had excellent contacts and contractors kept in contact with her.

11

Date 04/09/14

DISCUSSION REGARDING THE PROCEDURES FOR REQUESTING PROJECTS INCLUDING BUT NOT LIMITED TO BUDGETING FOR PROJECTS, PROJECT RELATED TRANSACTIONS, AND POLICIES RELATED TO THE PURCHASING POLICY — cont.

Jim Basinger stated they had to find out what exactly was going to happen inside the kitchen before we could get a quote from anybody. He stated he had looked at the plans and what they wanted in there; he called an outfit in Sparks, Nevada Restaurant Supply, to outfit that the way the county wanted it done was $32,000. He stated the 170,000 BTU stove in there and the Ansell Hood over the top of the fire suppression. He stated that had to be installed by a certified installer. He stated it just seemed like a whole lot of money. He asked if they were going to have a contractor come in, were they looking at Steve again.

Lorina Dellinger stated she didn’t know. She stated it depending on how much it was and if it was over a certain amount they would have to go out to bid for it. She stated they would get quotes and go with whoever was the lowest. She asked if the equipment that he looked at was a requirement from Bob.

Jim Basinger stated it was on the plans.

Lorina Dellinger stated they were going to call the Department of Health to find out if they had to put that type of commercial of equipment in there. She stated if they were not cooking they could use warmers. She stated that might be a cheaper option. She stated if it was to be commercial and over $25,000 we would solicit the quotes and go with the lowest. She stated if it was over $50,000 we would have to go out to bid.

Susan Paprocki stated that if it was over $100,000 they would have to pay prevailing wages.

Lorina Dellinger stated that during the meeting it had been the consensus that they didn’t want to go the commercial route.

Janice Lyman asked if she knew what funds were remaining.

Lorina Dellinger stated she thought she saw a figure from Amy, and she could wrong, but it was about $8,500. She stated there was not much left.

Jim Basinger stated he had talked to NV Energy and they still didn’t have a plan when they were going to come and set the pole. He stated he would try to get the conduit and panel and he would call Tina about that. He stated he talked to Sheldon today about bringing out the conduit and the panel and have him install the panel. He stated he would install the conduit to the pole site and it would be inspected by Dave out of

12

Date 04/09/14

DISCUSSION REGARDING THE PROCEDURES FOR REQUESTING PROJECTS INCLUDING BUT NOT LIMITED TO BUDGETING FOR PROJECTS, PROJECT RELATED TRANSACTIONS, AND POLICIES RELATED TO THE PURCHASING POLICY — cont.

Hawthorne. He stated then they could come out and put the pole in but he didn’t know when that was going to happen.

Lorina Dellinger stated she would address that in the next item. She stated she wanted to make sure they understood to get projects approved rather than just everybody trying to do a piece here and a piece there.

14. GENERAL PUBLIC COMMENT

Lorina Dellinger stated Pam had been working with Eric Mendoza with NV Energy. Jim Basinger stated it was Henry Mendoza.

Lorina Dellinger stated today Pam informed her that NV Energy has to be here when the trench was dug and Joe Walker was coordinating that. She stated Joe with Buildings and Grounds was the Project Manager on this project.

Jim Basinger stated when he dug that, Dave would be here.

Lorina Dellinger stated Joe was coordinating that dig with NV Energy. She stated there were two groups of people that were working on this that aren’t talking to each other. She stated that Joe and Pam were coordinating with Henry on getting that done but Pam didn’t tell her the date. She stated the ANTC Agreement which she sent them a draft of, had not been executed and she didn’t know what the holdup was. She stated she was supposed to get pictures today from inside the building but they couldn't get in. She stated she needed pictures because Kevin was claiming it was not complete to the scope of work that was in the contract and we believed it was. She stated there was a disconnect that needed to be resolved because they have not paid their portion of the contribution, therefore we couldn't sign the agreement.

Janice Lyman stated she didn’t see in the agreement any place for rent or lease.

Lorina Dellinger stated that didn’t have anything to do with Arizona Nevada Tower. She stated that would be up to the Gabbs Town Advisory Board to implement a policy for the use of the building.

Janice Lyman asked if the broadband people or Atom Splash were going to pay to use the building and have their computers there.

13

Date 04/09/14

GENERAL PUBLIC COMMENT — cont.

Lorina Dellinger stated they would not be as they had a contribution. She stated that was what they were waiting for. She stated the payment was about $56,000 she believed. She stated there was no payment coming from anybody for anything.

Janice Lyman asked who was going to pay the power.

Lorina Dellinger stated the Gabbs Town and it was because it was a service being provided to the Town of Gabbs residents. She stated they didn’t have to put in a county lock key system; there was no work order that had been put in. She stated the county does need a copy of the keys. She stated that a Key Agreement Management Plan needed to be put in place so that if a key was issued to somebody, there was a key agreement that had been signed and filed here in Townhall.

Kenneth House stated that was the same as the keys issued for Townhall.

Lorina Dellinger stated since it was a county building they would like a key issued to them. She asked if there were two different locks on the building.

Jim Basinger stated there were three doors that were keyed alike and one door that wasn't.

Lorina Dellinger stated if they could get a copy of both keys that would be great.

Jim Basinger stated he didn’t know where the key went for the one door. He stated that he was the only one with a key for the Community Center at this time and he had been trying to get more keys made. He stated Reyna told him that county locks were going to be installed.

Lorina Dellinger stated there was talk about putting in a county lock system but it was just rekeyed not too long ago so it was fine.

Janice Lyman asked if it would be paid for out of petty cash. Lorina Dellinger asked if there was somebody here locally that could do it. Jim Basinger stated he had tried to get him to make the keys but he didn’t have the

blanks. He stated he was going to Fallon and he would get some keys made and give some to Reyna.

14

Date 04/09/14

GENERAL PUBLIC COMMENT -— cont.

Lorina Dellinger stated she could keep one here in the town office and then we would take one for the county, Sheldon could keep one, and then if there was a request made for one, but she didn’t know if they wanted to put a policy in place. She stated that not just anybody should be able to request a key but if someone was renting the place they should sign an agreement for that one key. She stated if someone was issued one during their term that would be a separate type of key agreement. She stated as long as that was managed and inventoried they could keep the lock system they had.

John Meyer suggested that if they put a combination access key pad on the doors they wouldn’t be worrying about keys. He stated a code would be issued and when the person was done the code was deleted.

Lorina Dellinger stated it was a good suggestion. She stated they had looked into those for a couple doors in the Courthouse and they were pretty expensive and decided not to go that route.

Discussion continued on combination key pads and codes.

Jim Basinger asked if he could let Kevin Hayes back in the building.

Lorina Dellinger stated he was the one they were waiting for the money from. She stated she needed pictures of the inside to see what he was claiming had not been done. She stated according to the scope that was in the contract, they have everything completed.

15. ADJOURNMENT

Kenneth House made a motion to adjourn; seconded by John Meyer; 5 ayes.