Public meetings / Hospital District
Northern Nye County Hospital District Board of Trustees: meeting of August 13, 2020
121 turns, 0 with a named speaker, under 8 agenda items. The words and the names are the county clerk's.
Attendance
SPECIAL MEETING OF THE NORTHERN NYE COUNTY HOSPITAL DISTRICT BOARD OF TRUSTEES 101 Radar Road, Tonopah, NV 89049 August 13, 2020 10:00 AM
Pursuant to the State of Nevada Governor’s Guidance for Phase 2 Reopening of the Nevada United: Roadmap to Recovery, The Northern Nye County Hospital District Board of Trustees will hold public meetings with no more than 50 people in total while continuing to follow social distancing and the Roadmap to Recovery to slow the spread of COVID-19. Board members, staff, members of the public and members of the press are included in the 50-person count. Public attendance will be on a first come, first served basis. Temperature screenings will be conducted prior to entering the meeting. The teleconference is also viewable at www.NyeCounty.net
NOTE: All items are approximate except for bid openings, public hearings, and any other items agendized at a specific time. Items on the agenda without a time designation may be taken out of order. The Board may combine two or more agenda items for consideration. The Board may remove an item from the agenda or delay discussion relating to an item on the agenda at any time. Items on the agenda without a time designation may not necessarily be considered in the order in which they appear on the agenda. NOTICE: It is anticipated that the items of business before the Board of Trustees on August 13, 2020 will be fully completed on that date. However, should item(s) not be completed, it is possible item(s) could be carried over and be heard before the Board of Trustees beginning at 8:30 a.m. on the next day.
Public Comment during the Board Meeting on August 13, 2020 will be for all matters off the agenda, and be limited to three minutes per person. Additionally, public comment of three minutes per person may be heard during individual action items. The Board reserves the right to reduce the time or limit the total time allowed for public comment. The Board may prohibit comment if the content of the comments is a topic that is not relevant to, or within the authority of, the Board, or if the content of the comments is willfully disruptive of the meeting by being irrelevant, repetitious, slanderous, offensive, inflammatory, irrational or amounting to personal attacks or interfering with the rights of other speakers. Persons are invited to submit comments in writing on the agenda items and/or attend and make comment on that item at the Board meeting.
Pursuant to NRS 241.020, the Agenda for the Board Meeting has been posted at the following locations. Tonopah Convention Center, 301 Brougher Avenue, Tonopah, NV; U.S. Post Office, 201 Erie Main St., Tonopah, NV; Commissioners' Meeting Room, 101 Radar Road, Tonopah, NV; District Court, 101 Radar Road, Tonopah, NV Additional Posting Locations: Gabbs Townhall, 503 Brucite St., Gabbs, NV; Round Mountain Community Center, 650 Civic Dr., Round Mountain, NV Support documentation for the items on the agenda, provided to the Board of Trustees is available to members of the public at the County Manager’s Office (101 Radar Road, Tonopah, Nevada & 2100 E. Walt Williams Drive, Pahrump, Nevada) and on the County’s website, www.nyecounty.net or by emailing the Northern Nye County Hospital District’s Administrative Secretary at nnchd.as@gmail.com. The Board of Trustees may take a short break every 1 ½ hours. NORTHERN NYE COUNTY HOSPITAL DISTRICT BOARD OF TRUSTEES AGENDA ITEM # SUBJECT August 13, 2020
Attendance: Karmin Greber, Chairman Steve Dailey, Korte Company Emily Hendrickson, Vice Chairman Christopher Gillum, Korte Company Don Kaminski, Trustee Bruce Bruner, Korte Company Timothy Gamble, Trustee Dr. Russell Pillers, Biowerx Consulting Tom Vallas, HCKV Dr. Van Le, Premier Medical Group LLC
Guidance was provided by the Chairman concerning call-in participation by our guests and presenters, as well as, the need for additional time to be allowed at the end of the meeting for proper sanitization of the Chambers following.
1. Pledge of Allegiance
Pledge was recited by all in attendance, and on the phone.
2. GENERAL PUBLIC COMMENT (Three-minute time limit per person.) Action will not be taken
on the matters considered during this period until specifically included on an agenda as an action item (first). No public comment.
3. Approval of the Agenda for August 13, 2020.
Motion is made by Trustee Kaminski to approve the Agenda for August 13, 2020; second by Trustee Gamble; none opposed, agenda stands approved.
4. Announcements (first)
Chairman Greber brings several announcements: Board Secretary-Treasurer Justin Zimmerman has resigned and we have notified the County Commissioners. Once that window for application for appointment by BOCC closes on August 27, our Board will have the opportunity to comment on their actual appointment individually. This will be agendize next meeting, so that you have a copy of his resignation letter. Concerning the new administrative secretary status -- we are have closed the initial posting. Justin Zimmerman reviewed applications and held interviews, making an offer to one, which was subsequently declined. Another candidate was provided from another local government organization, who also was made an offer, which she declined. We have two additional candidates under reviewing and then we will repost if we are not successful. In the meantime, the county has graciously agreed to leave our current Secretary permissions open so that I am able to do our agendas and minutes, as well as all of our administrative requirements. Additionally, the Nye County administrative secretary is supporting our meetings and currently doing the postings. So when we have a deadline on agenda items and backup, we're going to have to be real attentive to those because we have very little room to recover if someone is late and it is a great inconvenience to the administration, we want to show courtesy in that. Concerning the CT calibration that the Board approved, we have a reduced quote and we have a scheduled date, which is on for Monday, as far as I know. More on that to follow. Please note: Marie Peterson of Tonopah Primary Care made a recent presentation for reimbursement, and I provided a recommendation letter as was promised. She did confirm receipt of the letter and thanked us, stating that she doesn’t feel her practice will qualify for the CARES Act funding. I invited her to submit further documents for her request, such as an invoice of evidence of completion, etc, so that we can agendize that and close out that issue. No further response or documentation has been provided at this time. Recommendation to Trustee Tim Gamble -- the Board needs to close out his initiative and deliver our letter of appreciation and the purchased commemorative pins to designated first-responder recipients as planned. Vice Chairman Hendrickson comments: She and Chairman Greber have worked closely with Dr. Pillers and the Nye County Grants Administrator on grant opportunities, primarily the CARES Act funding. The initial presentation for the Commissioners’ review was presented at the BOCC meeting on July 21, 2020. We are asking for approximately $800,000 to help recoup the costs of our clinic renovation which was COVID related. No negative feedback from the Commissioners was noted, and the response appeared to be supportive and positive. Secondarily, the CDBG (Community Development Block Grant) is also being worked. This county-sponsored grant will eventually travel to the Governor’s Office of Economic Development for approval. These particular funds are suggested to be applied toward the demolition of the hospital buildings, pending approval of the PAR today. We are on track and on time with all steps of the grant process thanks to Dr. Pillers. No further announcements.
5. For Possible Action – Emergency Items
No emergency items.
6. Trustees’/Liaison Comments (This item limited topics/issues proposed for future
workshops/agendas) Chairman Greber states owing to the resignation of Secretary-Treasurer Zimmerman the Board will need to elect a replacement executive officer at our next regular meeting on August 20, 2020. Vice Chairman Hendrickson offers an upcoming agenda items for a presentation by Stacy Burns, the new Southern Regional Behavioral Health Coordinator. Her office is interested in working together with the District as appropriate, to our joint benefit. No further Trustees/Liaison comments.
GENERAL BUSINESS
7. For Possible Action – Discussion and deliberation to accept, amend and accept, or deny the
acceptance of contract deliverables including a Preliminary Architectural Report (PAR) and ancillary information as presented by Korte Company regarding the remodeling or replacement of the main medical facility located at 825 South Main Street, Tonopah Nevada 89409 otherwise known as Nye Regional Medical Center. Additional discussion will include planning next steps on a ‘Design/Build’ competition if it is determined replacement is the option chosen for the facility. The floor is turned over to Mr. Steve Dailey of Korte Company, and his colleagues: Mr. Chris Gillum -- Project Architect dealing with healthcare; he comes with varied experience across large format and critical access hospitals throughout the country; Mr. Bruce Bruner -- Vice President of Healthcare for the Korte Operations Group responsible for all healthcare delivery across the design and construction processes; Following is a lengthy introduction and background narrative, by Steve Dailey to the Board, followed by presentation of the official findings contained in the Preliminary Architectural Report; best effort has been made to capture verbatim what was conveyed to the District Board of Trustees. The reader is reminded that the presentation in its entirety is available on the Nye County website at www.nyecounty.net:
“Thank you. Much appreciated. I'll ask you, both Chris and Bruce. If I make a miscue or misspeak, please feel free to jump in and correct me. And questions are welcome. As we discuss here, first of all, Chris and Bruce are only part of the team that has evaluated and produced this PAR (Preliminary Architectural Report). People involved in this include our president of our Las Vegas division, Greg Korte, President of our company, Tom Korte, the director and manager of our architectural division, Darlene Hank, Dustin Ceber project representative. He was here on an initial survey. Xyla Brungerbute Project Executive and Mike Sutton, who has headed our pre construction has been responsible for direct estimating on this project to date.
When I was here in June, we had already come to a conclusion and much of the material that we presented then remains relevant today and is included in writing and in detail in the PAR that you have received. But our initial conclusion remains, the cost of renovating the existing building for inpatient care and or nursing home usage in the future will exceed in our opinion, the cost of demolition, and the cost of new construction is a more economic alternative. That's the basic.
When we looked at your facility, we were asked to do a number of things. Originally, we provided you with a proposal, we told you that we would review your existing 2019 comprehensive Community Health Assessment Report. We noted that in reviewing it, it did not assess some of the key indices and statistical projections you would expect of an acute care hospital, and that we would in our planning and marketing analysis, update that appropriately. We would look at the need for inpatient beds, we would look at the need for outpatient services. And we would provide you our input on what we saw as realistic given your market share potential, or this community, this region and the history of the organization in general. As part of the PAR, which is required by the United States Department of Agriculture, we were asked to give a general description of the existing facility, its current condition. Why in the event you do go to USDA, you need money for a facility. So we've outlined that, and that is perhaps the key elements of our project. And PAR report. We've given you the result of that evaluation. And I've already spilled the beans on that, that being renovating and updating the existing facility since it has been closed and is no longer allowed to utilize grandfathering of old code issues is simply an expensive route. Is it accomplishable? Yes. Is it economically appropriate? We didn't think that was prudent. And we've told you so. We've gone over the general program evaluation elements in our meeting in June. We talked with you and I presented some original recommendations as to program for yourself. The board gave me feedback and comments and we use multi voting as a technique to get to the crux of what was thought was to be important and that is reflected that discussion is reflected in the program elements included within the PAR. For example, in my original projections, that is the Korti Company's original projections, we projected six inpatient beds. It was the board's commentary and feedback that ended up increasing the size of acute care beds that are shown in the program within our PAR.
We've evaluated your existing building site, its suitability for an acute care hospital. Its usage could you fit a new one acute care hospital with its parking and access on that site appropriately. We have looked at the cost of designing a new facility and create a budget for that. USDA requires a general budget we have created a generic budget based on the generic program that we have established. The program is one of the elements that USDA requires. That is what are you going to put in the building that you want to either replace, renovate, expand or build new. Within that we have included the basic elements we would expect to be in a facility that you have discussed. This would be subject to revision during design development. None of the work that the Korte company has done involves design, it involves planning and for our purposes, what we have is essentially done is say, is it bigger than a bread basket? how big should it be? And what is it likely to cost? As a design- builder, we're not an architect, simply running to a book and going well, I think it'll cost this much. Because it's this many square foot. We're a builder. We know what things cost. We're on a day to day basis talking with subcontractors. So when we provided our budget, we have feedback for you. That is much more specific than you would be able to get off this many square foot this many costs. And we have included in that our assessments of your existing sloping building site, our assessment that your existing building site is buildable and some internal assessment on our part of how we would go about that. And although we've had to do that for estimating purposes, we have not included it in this report. We have added a projected range of what you would expect for medical equipment budget in a facility of this size, you have some things modest though they may be that can be reutilized, you have some more sophisticated, such as your CT with rigging might be able to be utilized in whole, we have projected a budget number for you there. We have outlined budget prices for typical medical equipment purchases of a capital nature that would go into a facility like this. Again, in design development, we would go into detail on that so that we make sure the rooms are properly sized. And that the equipment that is provided is what you want. Someone may say I want this, someone else may say I want that. And those are decisions that will be made at that time. For our purposes for the purposes of satisfying the Department of Agriculture with this PAR, we have provide a generic outline. We began this project with a site visit in March. We've been in continual communication. Since that time. Our visit in June was extremely helpful in terms of defining the parameters of a hospital. I want to outline and express that although this does not lock you in. It defines what you're thinking about at this point in time. I have done over 42 USDA projects in my career for funding. They start one way, when design development is finished. They're often completely different. When a CPA firm, a healthcare oriented CPA firm comes in here and looks at the statistics the market share the market themselves. They're going to come in and they're going to say we think you can afford this That may or may not be what the Korte company or non CPA firm has done is what I've provided you is based on my experience, an expert that puts their time and attention into the numbers is going to get closer. That will further impact how your design development evolves. But at this point, what we've tried to do is give you a realistic yet economic number for a basic program for you to move forward and we have recommended that you do not take our word for it. We have recommended strongly that you bring in multiple healthcare experienced designers, as teamed with other general contractors, and let them give you their feedback. And we have outlined to you and suggested a design-build competition is the only fair way to do that. And USDA requires free and fair competition. By invoking a design-build competition, you can have interested organizations or teams that put together here's what we think. Someone may come in and say, Oh, I think you need 25 beds. So and it's going to cost x, someone may come in and say, I think you need 3. It's going to cost y, here's how I can do it. Someone may say I want it to be two stories, someone may say I want it one story. You're going to have different competing ideas. And the advantage of this is you don't pay a dime for it. You have an opportunity to look at how your finalists determine and work with you in presenting ideas, and even if you select a finalist, based on the brilliant idea, they have three months from Now or six months from now, you may completely reconfigure that design solution, but you've selected who you believe was the best. And instead of having stood for you, the 50 year old suntan six foot two architect with a ponytail, you've selected based on real criteria, and you're working in a free and fair manner. And finally, when you negotiate your final contractual agreement, if you don't meet in agreement with that organization, you just stop say no, and you go to the next competitor, and you go right through the process again with them. You still haven't expended a dime until you begin your schematic and design development process. So that is what we've outlined and recommended to you and in fact, we would tell you don't submit your PAR until you have selected a design- build team or firm for the district's purposes, that way you can give USDA exactly what impressed you. They'll see a bubble drawing. It may be developed to a schematic level, it may just be a bubble drawing, it may be a series of program items, saying we can do it this way. But concretely, you're doing something free and fair and open and everything that the Korte company learned during the development of the PAR itself, is going to be handed to every one of your competitors who compete on a design-build basis so that there is nothing held back in that process.
I've spent more than 25 years of my life as a hospital administrator. I know how to stack the deck. You don't want that. This is not who-went-to-whose-cocktail-party? This is free and fair competition. And the competition can be brutal. And it's sometimes comes up with ideas that nobody ever would have thought of, unless they were competing to try to come up with the best way to skin the cat. I'm probably offending someone with that analogy, I apologize.
Here's what we used in developing our program. We believe your average acute hospital census is going to be a little bit higher than 2.5 after five years, that doesn't sound like much. Well, there were 1200 some-odd critical access hospitals in the United States. More than 600 of them have average daily census on an annualized basis for acute care hospital, lower than 3.5. So you won't be in good company. Yes, essentially hospitalization rates are a function are developed in several different ways. One is to look at your potential market share. That's going to include your local community, your regional community, what was defined in your community health status report, which has a population catchment area of about 19,000. When I did it, I came up with a figure of about 16,000. And it's reflected in one of the pages that will go over within the PAR. But the idea is, there are definite hospitalization rates and definite patterns within certain areas of the country. Beyond the hospitalization rate is the type of hospital you are you're not going to be a tertiary facility. You're going to be a bread and butter, acute care critical access hospital. And in that circumstance, you're going to probably forego 60 to 65% of the inpatient hospitalizations, they're not going to fit your facility and its capabilities. So you probably are looking at a 35% market share. So when we look at that, we can average how many hospitalizations by age grouping demographic and by region. And when we do that, and then we cut it by a market share for impatience of about 35%, we came up with 2.5-3. I use the conservative here, in my original projection that I brought to you in June, I told you I thought that was worthy of six beds, and I tended to use six acute care beds, because that's a perfect critical access hospital nurse staff, nurse patient ratio of six to one for that purpose, for the purpose of this PAR, we showed nine plus one for a total of 10 acute care beds, and we'll come back to that in more depth. Because that was, there was something concern that will, how will we deal with growth over time? How will we deal with a mini epidemic in the wintertime, for example? And that's what's showing in it when you're finished design development and you know, prices and someone says, Okay, this many beds means this and so forth. You may go back to some of the original recommendation. You may have another architect and constructor that comes in and says, Oh, no, you need 15 beds. Let them make their argument for that with you. Within the PAR, you will see how we establish that based on hospitalization rates, and your demographic profile by age. I mean, statistically, in the United States, I think I mentioned this in June, once you're 18 years old, unless you're having a baby, you dont, stay overnight in the hospital until you're 65 years old. So again, the demographics of your community are very important in computing, computing any of these statistic sticks here. We looked at long term care. And we looked specifically at skilled, long term care. Truth be told when we get to design level, you may design Long Term Care rooms that are identical to acute care hospital rooms that allow you if you have growth in the future, when, you may want 25 or 30 Long Term Care beds, and you'd rather have those rooms to be able to expand your acute care hospital on a growth basis. Right now, that kind of growth we don't see. But just as COVID has crept in and completely turned the applecart overturn, one of the things we were asked is, how do we grow in the future? That's one potential way of accomplishing that.
Trustee Gamble questions how many of these beds etc count towards swing beds when considering a Critical Access Hospital?
Mr. Dailey responds Critical Access Hospitals, by definition, are 25 beds or less, and all 25 beds can be swing beds. Trustee Gamble questions if the 25 swing beds count towards that 25-or-less criteria?
In answer, Mr. Dailey continues his presentation: They're in it, in a typical critical access hospital, you might bring someone into the emergency department, put them in overnight, you've got an IV and then you turn over and they only need they only qualify for a skilled care because they got an IV, and so forth. And you may keep them for three or four days. You are advantaged in a critical access hospital and the reimbursement and the payment for that skilled nursing care, you will get paid much more than a skilled nursing unit here. When I speak to the fundamental program here, which includes 12, long term care, skilled nursing facility beds, that's literally a separate unit. It has to have doors, it has to be addressed differently. It has to have things in an acute care unit, like an activities room for for clients that you wouldn't find in an acute care hospital. But by definition, critical access hospitals are allowed to provide skilled care and to be reimbursed competes for them far better than the typical skilled nursing home facility is. Likewise, just as an aside, you know, you have a clinic on site. Having that clinic on site, you can get reimbursed more by having that clinic on insight than if that clinic were off your site, again, that's part of the magic of the critical access reimbursement formula. We've based your emergency department visits off of historical now I will tell you, as your clinic develops and becomes more successful, I probably would expect that emergency department volume visit number to go down. That's not bad. Okay, that is not a bad thing. I've been in many critical access hospitals where you have to have two separate doors. You can't have them Walk in the ED registration and say no go there. It's going to be less expensive for you. But that's the way you're going to educate your community. To appropriately use your resources as you move forward. We have recommended in the PAR and we recommended it to you in June a full blown laboratory here as much as you possibly can, investing the money in the equipment and the train staff to operate it. It is a moneymaker for an acute care facility. Your imaging volume is a compilation of past imaging volume that I was able to take from the hospital historical data going back to 2011, 12 and 13. I did not have 2014 data. And it was easier to project off of that. And then to make some educated guesses based on what I see in similar community size. In other critical access hospitals, they say in five years, that's what we would expect you to be at. And the reality is the radiologist, wherever he is sitting given the internet, interpreting these things is going to be sitting there going normal, just normal, just normal, just normal just and that's, that's where your volume is. Your other annual outpatient visits we addressed, you might have some physical thing, you're going to have some physical therapy, some of your swing patients are going to require it and if you have the long term care, you're going to need yes, some things there. You're going to have EKGs on an outpatient basis, you're going to have other cardiology studies, you're going to have respiratory studies and respiratory treatments. And those are being shown extremely conservatively, in my opinion. Right, there wasn't enough data. For me to make an accurate projection at this point in time. I've used the 25th percent quartile that is the bottom or tile at 75% or 25%. However you wish to look at that, for facilities this size and coming up with that, that information is going to mean a lot more your healthcare CPA than it will to yourselves.
We concluded, there is a clear demand and need for the facility. One thing the board wants it. We're we're a mirror we're reflecting back to you. But that's a 2.5 inpatient census. Most of 4000 EV visits, significant Long Term Care skilled volume. All arguments that we believe will play well with Nevada's CLM program to bring your hospital back to life. there's sufficient need that I don't believe they're going to say, you don't need it. What they are going to say, and this we will get into, or you will get into down the line is, they may say; You need ten minutes, how about six? Now, those are things that happened in the certificate of need process. It is an open negotiation of sorts. And it's something you're going to be on a first name basis with the staff member at the COM and review board with.
We have reflected Critical Access requirements or codes in the evaluation of our PAR you may decide not to be a critical access hospital. That's possible. We understand that, but we were asked to look at it as if you were. There is a significant difference between state and federal requirements for critical access hospital, licensing for critical access goes through the feds versus just the state. But the same reviewers at the state level will review the documents. But they have a different set of standards that they have to apply for a critical access hospital. The biggest difficulty that you encounter is that your hospital has been closed. And you lose all the benefits of what would be grandfathering in other circumstances relative to a critical access hospital. And I personally spoke with the Center for Medicare and Medicaid Services. And try theoretically may I make the case that this hospital hasn't changed and the community hasn't changed? “No, it's not licensed; no, grandfathering does not exist” is the feedback that I received.
We provided an ideal financial project. The pie chart; their preferences where we thought your reimbursement would be coming from. I understand you may have changes in that, well, there are going to be changes. Those are the pie chart is based on five years, its not your one, you're going to grow over time. And in order to provide certain services you may have to forgo certain other services. That's something that's going to develop. What we did though, was project, an ideal financial situation for you or basically a $20 million operating budget, two thirds of which is going to be outpatient services, and a $20 million building. What the operational numbers they're they're far too small to see here, reflect though, are the operations of what we believe we would expect. Now I'm going to cut asside here. I've been doing this as a consultant for some 20 years. And for some 25 years as a hospital administrator, including running critical access hospital, and I'm currently a board member of a critical access hospital. I've used my best knowledge in doing this. The Korte company is not interested in me presenting something to you that we don't think is possible because my company is interested in winning the design-build competition, and moving forward with the project in whatever manner and configuration it becomes. So I'm putting my own career on the line here when I say I think this is doable, and I'm projecting it based on the rigors of what you can expect. We've provided you with a capital project budget now when you go out and you say you have your your original phase one competition you Request qualifications from design- build teams and firms and you narrow it down to your vital three or four competitors. What you want to do is put them in a box, you want them to estimate what they believe the project that they're going to suggest is going to cost. The best way to do that I have discovered over the years is to use the same format, your state certificate of need, utilizes. So this format is identical to the way a CLN breaks it down. You're not going to see a line in there for IT; you're not going to see lines in there for certain things there within those lines. But what this does is make force everyone. They use the same standards so you don't try to measure apples to oranges. And somebody has a 5% contingency. Somebody's got a 25% contingency. Somebody put $5 million in for medical equipment, somebody else put whatever you're not mixing The items, you can see what any architectural and engineering is going to cost, you can see your site development. And based on the program we put together within the PAR, this is what we saw, as I said, that program is going to change, it's going to be altered. Essentially, it's 10 acute care beds, 12 long term care beds, we suggested two do single and five doublem. Then emergency department stations and two surgical procedure rooms. And there's all sorts of variations that when you get into a design, build competition, that people are going to interpret those statistics. They're going to agree or disagree with them, and they're going to tell you what they think and why. That's what you want. Basically, this format, though, forces everybody to put their final answer in the same format,that you're going to have to when you put in a certificate of need for this project.
We've been asked to put together a timeline. Now, you can take sections of this timeline and say, well, let's say we don't do this until such and such, okay? Well just change the start/end dates, you have what we think would be appropriate. But in the preamble of our PAR, but on this slide, we're showing a design-build competition between now and December. We're suggesting that somewhere between now and then that gets done. Again, we think you should pick your team. That way when you've got a question and somebody wants to call somebody, you've got somebody to call and you've got some feedback. It doesn't cost you a dime to make that phone call and for a quick answer, you don't have to have a contract. And your company that you select, your team that you select doesn't have to have its hand out ring in the cash register. But it gets you down to where you have someone you've selected. You would, during that time, hammer out the details of a contract, and make sure that both sides could live with the final result. Your market analysis and financial pro forma candidly, I think you have enough market analysis between your community health status assessment and what we've provided you with that you don't need to go fill the coffers of another consultant. I believe USDA will give you a pass based on what you have already. But until you have that discussion with them, we won't know, you won't know. You will have to have a healthcare CPA firm. Say we looked at these statistics. We didn't say we thought they were good, bad and different. But based on this, we see this and they're going to turn around and they're going to say well, let's break that radiology down, that image down, by piece of equipment. Okay, that's doable. Um, you're going to have long since seen my invoice and paid it. But if you call us we're going to give you numbers. Okay? If it's not us, that's another design-build firm, they're going to give you the numbers so that you can complete that pro forma as necessary. And the basis of that pro forma that CPA firm is basically saying, Yeah, we think this is what they can afford. And as I've said before, if they come out higher, that's great. I'm not going to tell you to spend more than 20 million in either case, but if it comes out lower, adjust your sights and you adjust your program accordingly. We would suggest your USDA phase two application, you basically have a year before it's going to come due and be completed. If you can do it shorter than that because there's money in Nevada this year. Great, they may well let you try. And they may let you slip in a CPA study down the line as a confirmation. But this is what we saw for design development. Once you've selected your design, build team or firm, somewhere in between February and November, you're going to start having those discussions. Possibly, If your CPA firm gives you positive feedback, and you've already gotten some of the grants, you've talked about, your design-build team may say, hey, start working with us. Let's get moving. Let's not slow this down. The longer you slow it down in the process, more expensive the building's going to be the numbers in our PAR are current numbers they are not escalated, because who knows? At this point in time, we expect your USD Funding decision next year in late fall. That's typically when they're released.
If you've got it this year, fantastic. We would expect your design review and approvals. Depending on when you start your design development when you complete it, going through the state, somewhere in between November and June of 2022. Typically with USDA, you have to find interim financing. Now, I'm not here to give you a course on USDA, I'm sure there's been some discussion with us. But typically USDA will offer some money to you on the state on the government loan direct, but they call it direct loan, and the rest is a Guaranteed Loan and some regional bank here will step up to the plate and they will take a guarantee of 90% of that money that they loaned to you typically that's how USDA funds are dispersed. I've seen them go 100% through USDA, I've seen them go as low as 30%. We can't answer that at this point in time and really won't know until you apply. And who knows where the government's going to be on spending and funding? Yeah, in the process. Construction, we're saying essentially June through August 2022- 2023. If you stayed on this timeline, and then you're going to have probably a four to six month period. for licensure inspection and opening, they're not going to say, okay, all your beds are open. They're going to start you with one or two, and they're going to move from there and they're going to find things. They're going to be looking not just at your building. They're going to be looking at what your board statements on how you operate the hospital. You're going to have to have documents that reflect the will of the board. We decided During design development to have this imaging this way, they have laboratory this way to have this many ED. And so they're going to, they're going to be looking for those documents. That's part of the inspection and opening process. So roughly, they give you a realistic you're talking December of 2023, from a standpoint and quite frankly, the incubator that you have in the reopened clinic you need that. You need the development and continue the continuity and the development of their services. Because without them, you're not going to have the wave that you need. You're going to have an empty hospital for six months or a year and you're going to be well in the locks after 12 months. So you need that incubator. You're indispensable with one another. And clearly tied. Let me throw out some process comments.
This program is suggested. We were asked about putting imaging with the clinic. It can be done. Right? There are design issues with that, but there are design issues with everything. So we want you to know, from a programmatic standpoint, there's a lot of flexibility. There's an awful lot of time for input and development here. We're not anywhere near design stage or at budgeting. We're at the pro, this is your preliminary budget. Essentially, that's what your PAR does. It gives you a budget and it tells you why. And in detail, I'm going to try to switch to the actual PAR report itself now. Bear with me while I try to find that
Our slides were designed to try to keep you from going completely into foggy land. Although I continue to believe in death by PowerPoint, and the PAR is simply more verbiage in that process. What we've tried to say in this preamble for yourselves, is that nothing we have done as an organization is to be construed as design. We've used our expertise as a design-build firm who evaluates your facility. We're nowhere near nor should you be at the design stage now. We just went through the project timeline, I won't bring you through that again. And I'm going to the first tab, which is the existing building site and evaluation now when I was here in June, I had a fancy slide that listed a number of the failings of the existing facility. I didn't use that slide this time because it's regurgitated within the PAR. But we started by looking at your site. And, Bruce, I'm going to ask you if you would turn to your existing building and site evaluation, tab one, Page Six. If you would just quickly summarize that again, Bruce Bruner is your healthcare architect involved in this PAR.”
Mr. Bruce Bruner joins the presentation, conveying the following: “Let's go through there and just in brief from what I visited on the site, so if you're looking at the existing building on this position here are the buildings essentially divided into two components. And if you're looking at the plan on the left hand side of the page, or the, my orientation right here, the east side of the site, it would be the emergency department in the inpatient care section. The other side of the plan would be what you'd had for your nursing home capacity that was originally within the building right now. The facility has been broken down where the existing Westside was currently being used primarily as administrative purposes. You have many of the rooms that were converted with temporary seems temporary unit on the windows so they could have small window air conditioning units. There are things inserted within the windows to get proper cooling for the spaces. I know there were several places where additional miscellaneous units were added for cooling within the spaces. What you did find when you toured the facility is the variety of spaces. I mean, this is again part of the issue. Our tour was a variety of spaces were inaccessible for ADA especially, they seem to have the intent they could be multi use rooms, but when you walked in there truly what you found out was the doors do not always meet the accessible requirements for approach. The bathrooms did not meet ADA in any means for either for the side approach for the wheelchair or for the showers to be met within the assisted living or within the inpatient care areas. And when we really start going down into looking at these systems within the facility, we see that there was inappropriate electrical, inappropriate gas and other services being provided for most of the spaces. This was built. I believe I remember seeing the drawings were saying 68 and 69. When the drawings were produced, it was built after that time period. That was appropriate for the time but modern medical codes have changed that water requirements were in almost everyone was deficient in the number of med gases required. Simple review of the room was in either the nursing care or in the acute care rooms you had; you had a single med gas outlet. I mean, currently you require at least one med gas outlet per bed and just immediately you see that was deficient mean electrical power for emergency services was deficient within each room. There's a whole cascade of issues that you would see trying to ebate for those rooms. I saw that, again, walking around in the northern portion of the building that outpatient services have been provided in there for the imaging and some of the things that we saw within that the CT renovation appear to be done properly. But what we did see with the inpatient services for regular X ray was that what was planned as a future OR had been converted to an X-ray room, and I really questioned for example, the door and walls being properly shielded and for appropriate spaces are shielded within the space. There was just a cumulative series of elements here that really made me question how the stuff was being used, and how you kept meeting some of these requirements, because I know if you're even trying to be grandfathered in, this facility was able to be done that some of these systems would still need to be re reviewed and improved, no matter their functioned to meet the guidelines under facilities access requirements for these spaces. As far as site access, we saw that the building does have ramps around the facility. But you're going to find that these ramps do not meet the ADA requirements. These were built prior to being ADA, appropriate slopes so you only had one appropriate entrance from the west side under the canopy for drop off to let somebody in the northern most entrance was very close, it was hard to determine if that truly met ADA. But with time you went through the doors which were non operable with ADA operators you would have maneuvering issues with all the spaces and backing up to the west side of the building or east side of the building [orientation confused]. The current canopy right now only has a five foot clearance and what we would run into as an issue is if you're doing any discharge from any ambulance, you had insufficient claims for an ambulance to drive underneath that canopy to do unloading in a covered area.
So just on the exterior of the site, you're just starting to see those issues being positioned into that. We also saw along the site, the parking lot access and areas were at a slope Were you a person within a wheelchair or being navigate through there would have problems navigating through the space and those were potentially issues as well in that zone. So just in brief, even though facility does not look bad, that just the functional aspects of it were deficient. Meeting modern code requirements for healthcare spaces.”
Trustee Gamble requests further comments from Mr. Bruner concerning structural issues.
In answer Mr. Bruner continues: [Allow me to] comment on structural and some of the materials here on this as far as the interior components, the structural issues right now on the building as a load bearing masonry. On the perimeter walls. The interior is steel joist, and steel framing systems. Right now just from what we could see above ceiling. The building itself appears to be fine as it was built and that was constructed. I don't see any issues as it was constructed. But in order to meet modern code requirements for a critical access hospital or any hospital which is infrastructure that because of its rating, we would have to meet the seismic requirements for your region and from what I can see according to systems bracing, there are no seismically braced mechanical piping systems or electrical systems that I could find above ceiling. When I looked at wall transitions between the load bearing wall and steel structure. I could not see any deflection capacity within those attachments how that was being established, with in that, and then going back to the exterior wall as far as materials. From the inside again I can see the load bearing masonry but as you walk around the facility where you have the patient restrooms, those small wall infill areas are done with metal studs and sheathing on the exterior. As I focused on the drawings, I noticed some of the sheathing was essentially clad with an asbestos material within that, and those piping areas from were mentally covered and with no insulation. And being a load bearing masonry wall there was minimal installation within the walls that can be and has been method of doing using thermal mass to heat the buildings by solar radiation, helping maintain heat through the day discharge it through the evening which is fine for the materials in that system to help out. But in your climate zone according to, bringing this up to code or here we would find that essential minimally deficient or the infill areas that's a minimum to have the current insulation and the roof would be completely insufficient because it appears to be a two inches of insulation only on the roof deck while the modern code requirement would be a minimum of six inches of insulation for our value of 30. It depends what manufacturers are used for the true insulation thickness. So it would vary by the manufacturer based upon how the structure is being sloped through here as you might find if you walk through the facility, the mechanical room does have a large warning sign on the door. That asbestos is found in the mechanical room and perhaps in other areas throughout the building. So they they warn you before walking into the space. One of the things I did notice I was walking through the facility, the existing war and some of the areas in the core area did have the black asbestos vinyl tiles in those spaces. So that was a big concern that can be encapsulated and used as a space again if it's properly encapsulated, but my concern was when you're doing ongoing maintenance with a facility, finding the asbestos within the materials and I'm sure you're going to be finding a proper lead based paint test that's being done within all these rooms, you will most likely find that material within the existing painting materials under these existing coats of paint.
Just let me throw in one more thing that I did find that I have questions on, which is something I had trouble finding documentation on, is the facility does have two active solar rays. One appears to be for the clinical one appears to be for the hospital. I didn't find any documentation in there I mean, within the facility and it was hard to access the mechanical rooms to where I could see what was going on electrical panels, but it did look like they have power feeding the facility, but I did not find anything related to the load being provided to the facility and how that was being handled for either your regular power or your emergency power with the amenities I find on site based upon the size of facility and the size of the generator room. I question if the existing generator didn't meet operational capacity and how and if the solar panels could meet that requirement for the capacity because I did not see anything on the exterior that would give me an applied area for battery power storage from solar panels. Looks like your evening power may be coming from the electrical grid while daytime power could be provided by the panels and not knowing your load for your fuel for energy heating. And within the space. I see that there were 10 propane tanks being used on the site, and that I can tell had to increase from the prior photographs I'd seen that facilities from original, I believe it was five tanks or six tanks that increased when we were unsure. From the other portion of the review write-up, we did see a container with a portable generator that had not yet been installed. And I did not know if this generator generator was intended to be hooked up to the hospital and was never installed or if this was to be temporarily stored on site. That information was not available at the time. So it would be a consideration that needs to be reviewed for if the facility was fully operational.
Just as a heads up just going into the individual patient room just to give you a heads up within the acute care room. The rooms are currently set up right now you'll see two beds within each room, as per the FDA guidelines for In the rooms, you will see a requirement that says in a single patient room, you need a minimum of three foot clearance around each bed. But in a two patient room, you need five feet clear between the beds, I looked at the size of a standard patient bed did a layout within the room and this would be found on page 25. Within the report of an overlay diagram that I did that you're going to see there was approximately four foot six and some change over between the two beds which was deficient in the minimum clearance between beds. And when you had the requirement for a four foot access quarter for patient bed transport. So when patients in the room you can get another patient past the first bed at the foot of the bed into the room you did meet that patient transport requirement. The issue I found within that room layout issue is in order for the room to meet ADA within the door and in the current layout. The door swings within the room right now it's currently do hit one bed and you do not meet the excess requirements to fully get patient transport in there without having problematic access within those spaces. I mean, that would, it would barely function to get somebody in there as far as the square footage or you're right on that cusp or that margin. But what you really run into within that, again, like I said is you're deficient on power, you're defficient on med gases, you're deficient within the ADA for the restroom accessibility within those spaces. Also, I look at how these rooms are being shared for the party wall between the rooms. And if you look closely at the plans, you see these closets that are inboard back to back. And when you get into modern HIPAA requirements, when things like this being built, you're not running as complete attenuation being provided between those two rooms, you're running into that closet being maximizing the floor space and not any appropriate attenuation between the spaces so that would be a concern as well that was not truly listed with an appointment. HIPAA is a modern, everybody's aware. Right now.”
Trustee Gamble references a previous conversation with Mr. Bruner stating, “Bruce, one of the things that you mentioned to me right off the bat is if you attempted to fix those rooms, you're talking about moving those walls, which you've already described have asbestos in them the floor making changes in the floor, changing space and reducing the overall utility of the area the way it's currently configured. And that's part of why the Korte Company included bringing that building up to what you need is going to be more expensive than running a bulldozers through it and beginning new again.”
Mr. Bruner responds, “Correct because when you get into that aspect of making these rooms meet ADA requirements for the restroom, then immediately the ability to have two persons within a room falls away five because let's current restrooms would have to be expanded in width and the patient rooms will be reduced in width so it does dual occupancy rooms. We had to be reduced to a single occupancy and just the amount of displacement of materials. And then we get into the issue of fresh air requirements that we now find within the modern healthcare code. That could be questionable within these spaces. I did not have an engineer with me at that time to actually be able to do that report with me. But I questioned that because I looked at how these were being done because I see that the some of the rooms like I said, did have window air units, residential style being placed within these rooms. In the nursing home side for the being when being used by an office worker. I would hate to question the fresh air requirements of what was happening within a patient room trying to get enough appropriate fresh air within that space as well.”
Trustee Gamble continues the dialogue, “Bruce, you've heard us discuss the potential for a design-build competition or you've heard me discuss the potential for that. Do you think someone during a design-build competition might choose to use any part of the existing building, could they?”
In response, Mr. Bruner states, “Yes, part of the existing building might be considered to be used, I think it could be used in the sense that it has good bones. And this sense of structure and portion of the building has a good floor to floor height. My issue with that is you would need to go back with a severe retrofit of all mechanical systems, all electrical systems, all med gas systems, and you might be that the only thing you really have kept is the floor slab and what you would have to come back in there and then do a complete retrofit because I can said on one of my repair report is the walls couldn't be kept through here but mean you're facing major cost issues of doing excavation around the site doing proper drainage around the site, getting proper access for grading into that. So, yes, you might find a portion that could be reused. I just questioned the expense of running into that and what might be worth saving. When you're going for retrofitting an unknown cost factor you find is within that.”
Mr. Christopher Gillum comments, “[I noted] in that part of the world, with the soil conditions, that it is extremely high PI. So you have high moveable soil, I'd really be worried about differential settlement, you know, to buildings moving at different stages. It's really not ideal in that type of environment, along with what is really been affected to the underground sewer storm, currently. So something we always have to think of when we work in that environment.”
Trustee Gamble states, “This is, to a layman like me, an incredibly complicated section of our PAR, which really is the heart of the PAR, which Bruce Bruner is, the author of on a primary basis. I'm wondering if there are questions, or that could be asked to Bruce at this stage, if anyone has any. I tried to anticipate some.” Chairman Greber comments that the rationale presented is somewhat irrefutable. Korte has, in her opinion, met the expectation that they will convey the realities of our contemplated project, and brought forth recommendations which were somewhat anticipated. Chairman Greber mentions the extensive time she has personally spent inside the facility during her tenure as Chair, and affirms she is not under any impression that to maintain portions of the existing structure would be of benefit. The information is good to bear in mind moving into the design-build process, if someone were to propose that approach, certainly we would want this information to fall back on and to understand the condition of our building.
At this point there is some difficulty with the cordless microphone in the Chambers, which had been provided as a courtesy to Mr. Dailey.
Continuing the presentation, Mr. Steve Dailey speaks:
“The next section of the report is tab two. And it's just, inside the PAR if you take the time, preferably when you're at home or at leisure, there is a scan code and you can actually go to 360 degree photographs of the virtually the entire facility which Bruce has put together, because you're giving USDA something in print. We have this tab which just has a series of miscellaneous, identified photos showing mold leaks and your vinyl asbestos tile and some of the other things, inappropriate penetrations. Smoke barriers not completed, things like that, just as examples that are easily seen in a bound book that'll end up in Washington DC at some point in time. Tab three is program requirements. And this is designed, essentially to reflect and we went back to a example provided by Medicare, an actual example by a company called BBH design where they laid out typical critical access hospital layouts just to reflect, gee, what configuration would it be, would it have all the twists and turns and inside and outside corner,, that the existing building has just to reflect inside a report samples, you know, there's an L shape there's basically an I shape. Could It fit on the property? And our answer is yes.
What you're going to see on page five of that tab showing the program elements is an iteration of program elements. Based on the discussion we had in June, and our own knowledge of what typically goes into a facility this size, this is again flexible. It's laid out where you can count the number of rooms. We showed. Nine acute rooms, we showed a birthing room and LDRP. I have seen without getting into design, I have seen designs were right at the end of one hallway. There's a double set of doors, and behind that is one room that you can open or close the doors if there's a baby. Then you have a birthing room, which provides your labor and delivery setting, and you have a nursery station, and you have an area that you can cordoned off. Because in the past this facility had, I think the numbers I saw were in between 35 and 55 births per year. I think the last number I saw was 46. And so you might have a circumstance where if you decided, and you had the qualified medical staff to do normal deliveries, that you would have that. Now in design, development, and even in your design- build competition, that there's a lot that goes with that. You will need a dedicated operating room, if you have OB. That is, it's not it's dedicated in between anytime in between other than 9am to 11am. No, you can't use it for anything other than OB. Alright, and it's a large room FDA guidelines are now I think, 400 and correct me if I'm wrong, Bruce, but I think it's 415 It may even be 440 square feet, that's a good size. That's a no that's a full size OR in 1985 even 1990 in this country. And that's money. OR's are extremely energy intensive. You're talking about right now 25 air exchanges and hour that's expensive to have the air heating and cooling capacity to do that. But it's one of the elements reflected within the program we created the space that it could be there. There are ways of accomplishing that.
That's why it's showing we showed basic your basic program elements that you would find for an eight station emergency department, including a decontamination room. We have found that there are opportunities for designers to share space within code And do such things as you do your recovery for your surgery your stage two recovering in the emergency department. That's typically your scheduled. If you have a lumps and bumps removal surgery or whatever is done in the morning, that's when your emergency department is typically the quietest. That's not unusual to see in a critical access hospital, where your stage two recovery is done inside the emergency department using emergency department stations. But you have to design your ED stations to accomplish that. We have variety on this listing of spaces of what would you have all the way through laboratory, full service laboratory and imaging, again during design development that gets either coned down or potentially expanded. The job your architect is going to have and your design-build team is going to have during design development is they're going to have to deal with, what I call corner office syndrome, or I want my office two feet bigger than everybody else's. Or I just visited hospitals, so and so and their imaging room is this size, why are you giving me one that's tiny, and so forth. These are your dollars and the job of the design- builder here is to keep you honest.
If someone comes in and says, yes, we're going to give you an OR, and I showed two hours in here, thinking that one for procedure and quite candidly, someone may come in and say, I want a 650 square foot OR I want to be able to do Steve Dailey's knee. By the way, I'm still waiting for mine. Well, I'm going to turn around and your design-builders going to turn around and hopefully we'll say, we can do that. Here's what it's going to cost beyond what we originally quoted you. That's your design-build process. And that's your trade off process. We went through the next tab, tab section four. Again, you're looking at the volumes that were on the original slide I presented to you. And you're also looking at your projected operating budget. I'll note that your operating budget here shows a significant operating income loss and a significant net income loss. Years, one, two, and three. This gets into the CPA organization and planning. You've got to have the reserves to be able to deal with those initial years. Or you cut your mortgage by cutting your program so that you don't have such a large loss initially, but I'm very confident actually in what I've projected here. You can project breaking into black ink. Now what's not reflected here, I've got a line of about $300,000 worth of government appropriations, you certainly wouldn't want. This is page two, by the way of this tab. You wouldn't want to have to offset $3 million worth of loss. That's where careful planning and staffing issues are going to come into play. Some of your designers in a design-build competition may design your building, so that you start with your outpatient departments and your emergency department. And then as you get them going and you're up and operating, then you go second phase. The difficulty with that is of course the additional costs of the building. There are different ways of handling that and this is where a competition of ideas is going to be your best friend. Some people are going to save shelf space. Some people will say no bite the bullet and go forward. This is where appropriately planning and looking at how you're going to staff how you're going to operate, is going to come into play. It's why we said, look for a project, total project costs below $20 million. You can look at some of the brand spanking new, beautiful micro hospitals that are south of Las Vegas, and in communities, they're actually rather well healed communities.
My generation would have called it silk stocking, communities. They start at about 45 million and go up, for their facilities. We haven't projected or programmed a facility like that for you. Because we don't see the return. We don't see the potential for this to be done. Your capital budget again, we had the original slide here. We have far more detail here. But, this is tab five, page one. I'm wondering, Chris, if you would like to comment on the capital budget.”
Mr. Chris Gillum comments, “I think that the position that we were in that you're looking at right now, that area. Because it's healthcare delivery. In the design-build nature is obviously our number one concentration within the Korte Company. So, the budget was really developed around probably two and a half to $3 billion worth of projects that are consistent with yours. So in other words, it's difficult, nobody ever wants to just put a square footage number on it. You have to look at the area, the location that you're in, truly what the market is and what its yield in Vegas.
Then really run through more of a benchmarking philosophy. So we took five or six projects, we took cost history that we're working with and currently pricing on Steinberg medical center there in Vegas, is how we, you know, come to these numbers, obviously, Steve is capable of doing the major medical equipment in the fixed equipment, but it really does benchmark well, we think it's doable.
You know, a lot of times people say, you know, the critical access hospital, you know, just needs to be bottom costs. We didn't really do that here, or, I guess the bottom cost is not the best terminology. You're going to do this one time. And we need to be responsible enough to put the type of equipment the type of scan and mechanical units that give you the highest value, long term. So even from an estimating standpoint, we don't just say everything's DCP and paint, two layers of paint, we really try to influence these numbers and give us a target that's doable. So I think just from an overall we felt, pretty comfortable with the number. Obviously, there's a lot of impacts, you know, we, Steve and I talked about this a long time, things that could potentially happen about this, obviously, scope, square footage changes could be one, what the city actually requires, I mean, you know, we're, thinking we have enough sewer capacity, we're thinking we have enough electrical capacity, you know, we're not having to put in turning lanes and, and doing a lot of off-site, you know, type of utility work. Those are all things that, you know, as you get into this deeper and we're able to ask those types of questions. Hopefully some of it comes out of the contingency, but there's always items like that, that we'd like to try to find upfront. Because, the whole idea of design-builders, you know, taking out the waste, it's not it's not just waste of bricks and sticks or how we build the facility. But it's, we don't want to draw it if we can't afford it. We want to give you everything we can possibly give you. And if we have to pay for a turn signal, we would like to know that up front so we can adjust building components show you kind of live where we're at on those costs. So that we can all make the best decision move forward together. That's kind of the overall process of how we you know, see this overall capital budget. Any questions?”
Trustee Kaminski asks for confirmation concerning the PAR portion describing site development, questioning that since their considerations include demolition, then would abatement of asbestos and lead and any other environmental contaminants be includes, as well?
Mr. Chris Gillum responds, “Yes, we actually did put that at the end. We do have the abatement for what we know what we've seen. We've obviously made a few assumptions. We have the demolition and abatement. All the site work taking all that up, cleaning out the potential [undecipherable] in that entire number. Yes, sir.”
Mr. Steve Dailey continues his presentation, “The medical equipment here, it was easier to kind of reflect initially where we think your spending would be based on the program. This is hardly all inclusive, you could spend twice the number. But I have seen critical access hospitals do brand new Greenfield that had nothing to take from anywhere, do with less. But you're going to find in the laboratory, you're going to lease a lot of equipment, even if we've got a $302,000 number there, you're still going to lease your audio analyzer. You're still going to do some things there. You may do some leasing elsewhere. The trick with that is timing it so that you get your loan first. And, and you're going to get into a variety of issues with that. We do feel that's going to basically equip your facility.”
As is stands, there are some things that can be put off until later. You might put off your OB until you've got someone and that you deal when you when your hospital is making money and has the ability to put money away for capital equipment to add, but that's going to be again during design development. We have to assume it's going to be there and design it to make it fit. You'll see on page 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11 an itemized listing. This is a general idea. This is very generic. It's not intended to be specific. But what it does do is in 10, or 11 pages say, here's the vital, here are the most important items that you're likely to come up with, from a capital dollar standpoint, I call it ABC analysis. This is the, this is the 20% of the items you will buy, that are 80% of the budget. And that you'll want to make decisions on right away and you're going to make some decisions, hey, we're going to buy this used. We're going to do this. We're going to do that. That list is intended to, in essence, bolster or verify the budgeted medical equipment and again, that's a USDA requirement with your PAR.
The next tab, tab seven key statistical information. What I've tried to do here is oversimplify a lot of data and bring it down to where you could look at stratifications of age groups in your service area. And use that to project either growth or shrinkage of volume by service. And in essence, this section is a discussion of how that was done. It's very high level. I am clearly a planning nerd, and I went to into a far greater amount of detail than this. But it doesn't serve me purposes to give you pages of Excel spreadsheets and tables. I've tried to summarize the vital information there. And what we saw what we did see that was probably the surprise was that the long term care in addition to skilled nursing care volume is very significant. It's more than the beds we've allocated in your program. Now, the other side of that is seniors tend to be go where the children are. And the children don't all live here. And so we've made some extrapolations in breaking it down and so forth. You can't just apply a number and an age group and go, they're going to be this many that are going to come here, but you're going to have still, I'm going to suspect some unmet need in the community, even with this program, and it could be significant. For just a simple uncomplicated, non-skilled, long term or what, as the bad name custodial care. It could be 25 beds. Right now, based on what we saw. We put the Nye County profile in here, this is not our work, we put this in because it's information we looked at, we realize you're going to have your competitors in a design build competition. They're not going to have the time that I had to look at things. They're going to need to see a copy of your health status analysis, they're going to need a copy of your drawings. Yeah, there, everybody's going to ask about the solar arrays and which goes where and where can we find drawings. Simply we included that to try to make it easier for them to make their own assessment. When they're looking at statistics, you're going to get different views, or conversely, and I'm going to bring this up now. You could say we narrowed it down to four companies. We know all four companies, all four teams can do this. We are certain of that, okay? Hey, we want these guys to do a 10 bed hospital and a 15 bed nursing home. We want these guys to do a six bed. And we want the clinic and we don't want any nursing home. So build this into a clinic and put it in the hospital. You can have you have the opportunity in a design build competition. It's still free and fair. They do not have to you do not have to say everybody's got to follow the program that the Korte company put together in the PAR, they can have their own opinions. And from my experience, you're going to have some strong opinions. And you may have to settle your own ideas. You may say, hey, spot us some beds and get give us a brand new clinic and incorporate it into the hospital and into the outpatient department. You have your own ability to do that. Depending on who your respondents are, if you if you get four respondents. What you don't want to do is to make them do so much work, that they spend 60, 70, $100,000 coming up with their competition solution, they're going to back off and they're not going to do it. People are going to want to give you broad ideas, bubble drawings, and an estimate. And, you know, we talked about a formatted estimate. You're giving them as much information so that they come up with their own ideas. As I mentioned, in June, about six times, I've seen our company in the design solution game, this is to your advantage. You just don't want to push it so far, that people back away and say, This isn't worth the time and trouble. The other side of that coin is you don't want people someone that's going to come in, and just say, we built that. Here's pretty pictures of it. This is what we can do for you. You want some ingenuity, some thought process in that picture and our experience is that people are generally hungry enough to do it.
The conclusion section eight. And I'm going to come back to, this section eight, page one or tab eight, page one, the conclusion section. Has that listing that I was looking for early on. That was shown in a slide in our June presentation. Bruce, if you can find the tab eight page one, I would let you go over that very briefly. On a summary.
Mr. Bruce Bruner joins the presentation with, “All right. Well, let me just say in general when we talk about the review of the current building, codes here in brief. When I saw and said fail on these codes, when I saw one item or more within that, I'd counted the whole category as a fail. So once I reviewed this under the aspect of following the current IBC guidelines for the National Building Codes as we go through here, that was a fail because of multiple issues and components in there. On the energy code, again, the walls and the roofs failed the energy code, the fire code, what we saw were spaces that were questionable. Space on the sprinkler edge within the space because of the remodeling and how the fire barriers were easily said what was that was removed or incomplete for going all the way through then were incomplete. On the FDA guidelines as far as patient care and the services being provided to the patient beds that was insufficient. Walking through there on your oxygen requirements for these rooms were insufficient. Basically every code when you found through there, something failed within every section of that As I walked through there and looked at the different systems that we saw for example, the nurses call and these other systems that were in place these systems were currently in use but according to modern standards and the ability to track these with some of the digital systems, they were not up to speed where we were at within the nurse call system the simple access to potable water within the facility we found a question within that because the facility was currently off I couldn't test these appropriately. When I was looking through these minor systems for power again, there were insufficient power outlets etc within that. It just seems like when you at first glance, the building was okay but if you got into this there is you really dug into so what what happens in this instance, do you follow in through these aspects of the room? Oh, yeah, that's missing or this is missing or something else would be missing within the spaces use really Analytica details but it's just been the first impression. The hallways look right, the first impression of the room size looks close to right i mean there's just a few things within that. But as you got the nuances of all the elements of patient care would find elements missing in every aspect of care. So I think like I said once you walk through this you're going to see Oh, yes it on topically, it looks okay. But as you dig down the aspects of what you need to actually provide good service, you’re lacking.
Mr. Steve Dailey takes the floor with, “Thank you. Again, I'll ask the Trustees: any questions?
No questions are posed at this time.
Tab nine or section nine is an index. And essentially what we did with that index is take our initial proposal for services to you, which has items to be completed in our PAR from A through L. And itemize, you could go to our original proposal and go into the tab and section in the report where those items were completed. So we wanted to give you a crosswalk where, unless you're really into the detail, the USDA will do this. So where they could look for the information (or yourselves) to see that we completed what you asked us to accomplish in the process. Up on the screen right now is our original proposal letter, to that effect. And the rest is appendix, relatively minor items that I don't think we need to go into. That's the summary of our report at this point in time. We believe it's complete. We believe that it accurately identifies where you stand and why you would want money for a new facility in a way that USDA would find agreeable
And the roadmap we've given you, we believe USDA has a format for funding their projects are designed in the old school, hire an architect after a beauty contest of presentations, hire the best presenter, and then begin to design and then go out and build your building. To the lowest bidder. We have suggested to you, (you're free to do whatever) that a design build competition will give you much more information, much more accurate dollar information then an architect's guess without having a general contractor to work with. What's going to happen is any general contractor that teams with any architect, the general contractor is going to temper since they know you're interested in being economically efficient. I didn't say cheap, but economically efficient. You don't want cheap you want you want a 20 year roof on your building, okay? You want handrails in your hallways, okay. You don't want absolute code minimum all through your buildings. You want to have the basics accomplished. What you design builders are going to do is they have the knowledge to more precisely present the dollars. And if the architect comes up with a solution that's expensive, they're probably not going to let them do it. Because they want to win that competition. It's their time that they're generating on this and they're not doing it for the exercise, either. That again, should be an aid to yourselves in the final solution that is configured for yourself. And then once again, I'll remind you, someone may come up with an earth shaking solution. And six months from now you can't afford it. And then you have to change it or six months from now. COVID has so changed acute care hospitals, and the way they're configured in the code that you have to do it differently. And you'll have the ability to do that with whomever you select. With that, I would say I can conclude the presentation of the PAR. And again, ask for questions.
By telephone, Dr. Van Le of Premier Medical Group LLC begins his questions with, “Yes, I have a few questions that I'm a little bit concerned about, and I would like to ask the gentleman to see if he would like to clarify for me? One of the problem I'm looking at is the budget projections. And when looking at budget projections, it just seemed some numbers just didn't make sense. I have consulted with a few people. Former CFO of St. Rose, also a former CEO of Trinity, she's now on the board of Trinity medical school, I mean Trinity hospital out in California and also on the board of UCLA School of Medicine. And then also, Howard Dorsky, a former CBO of Valley Hospital whom Russell has met. So one of the things that I'm concerned about is there's no questions that the needs in the medical and the healthcare needs of Tonopah. I agree with the assessments of the tear down at the hospital. I agree with everything else. What I'm concerned is when you project a budget, and the budget has to be somewhat close or as close as possible to the realistic expectations. So then that way that whoever it is, if you're going to have a pair of competitions and you're going to put a template out there, you need to have a template that is as measurable and that is somewhat can be defined and correlated to whatever it is that we're doing. And one of the concerns, one of the question I asked is in the build out, I looked at everything you have on there, I agree. And so the codes that you guys use, what year and what Standard of building codes are you guys using? To do this to do the preliminary layout at the hospital? To this questions, Mr. Bruce Bruner replies, “I projected using the 2018 code based upon when this would be adopted within the state of Nevada, Nevada, I believe right now it's using the 2015 code. With the adoption cycles. I was using the newest worst constraint that would be out there.”
Dr. Van Le responds, “Okay, because based on my knowledge, In 2019, there's a new set of codes that came out. And the reason I know this is I just built an ASC and I started at the edge, we started to research into the design of the ASC, the ambulatory surgery center, and at the end of 2018, my projections based on the code so 2015 before it was going back and Steve Government is the state inspector at the time. So we had an extensive I had to revise my budget, like three or four occasions with my architecture and all that because it's 2019 because he was basically using the he says that there's a new set, there's a new guideline in 2019. They haven't published it yet, but I'm using that and here's the guideline.”
Mr. Bruce Bruner asks which codes is being referred to.
Dr. Van Le continues with, “Let's say for instance, the OR okay. The size of the OR what class of a room are you using the, AR Class A, Class B or Class C? Leave I was just Steve I was looking at looking at Class B and Class C were the options? okay because what happens is in 2019 they eliminated the classification of A-B-C; it basically says if you're going to open if you're going to have based on what you have to present to you have to tell them what you're doing what your usage of the OR so the usage of the OR, if you were using it for orthopedics because of the equipment that's needed if you using it for more extensive more complicated surgeries, whatever it is, you have to define it and the standard or they made it now for the hospital is six hundred square feet roughly. And then the other OR has to be a minimum of 400 square feet. So we went back, because originally we were going to do it because we do pain management in orthopedics. Mostly at our ASC. So we basically had to scrap because we thought so we were going on conclusions that we were doing it as a class A, and a Class C, and a class CLR. So basically that we have to scrap our budget. Can you hear me? I'm sorry? Yeah, so we have to basically scrap our budget and then we have to re-do a budget in it. But in the reason I brought this in is because if we're going at a code that is different from what the current code, the projected cost for the construction is going to be far more than what you guys are projecting.”
Chairman Greber thanks Dr. Van Le for his input.
Continuing, Dr. Van Le comments, “The other questions I have is in terms of your operational projections and your revenues, when you had your revenues 80% discount that means that you're banking on the reimbursement of almost 82% from whatever you build, and based on the demographic and the payers in Tonopah and majority of them have Medicare. Medicare does not reimburse 82%. Howard, based on my conversation with him, is that the projections of revenue is way overly optimistic, given the populations giving the reimbursements, giving a variety of other factors that comes into play. My fear is when you purchase things like this is that if we do wind up doing one, even if you stay in budget of $20 million, the problem you're going to have is how is the How is the board going to be able to pay if it's running on the bread, and there's no way if your projecting the revenues, if it's unrealistic, there's no way five years, they will be in the black.”
In response, Mr. Steve Dailey explains, “Yes, the multi-faceted question first and foremost as a critical access hospital Medicare is on the inpatient side is going to reimburse not 80%. On 82%. They're going to reimburse 101.5% plus market adjustment. For the inpatient part. That's part and parcel of how a critical access hospital is reimbursed. And the licensure and the codes will not be the state. The hospital a critical access hospital will be licensed through the federal government, which means the federal government's selection of codes will be controlling, not the state that might help describe, I will not say that the projections that we have, are either optimistic or pessimistic. We looked at similar hospitals and similar facilities with similar statistics. Projections that were critical access and put those numbers together. But you will see that we identified it as an A in an ideal circumstance. And we did it as a projection and we have said a CPA firm is going to have to come in and validate that and that that could adjust the numbers down or up. The reason for the budget at this point in time is so that you have something to reflect to USDA. This is an order of magnitude of money that we're talking about. As for the ORs, we projected and I mentioned if you decided to follow an OB program, and you have an over 400 square foot, then you are going to need an OR that fits that category and it's going to be a dedicated OR for the rest of the facility. The way The functional program is showing right now, we showed we actually showed a procedure room which could be lumps and bumps removal. We did not reflect orthopedics, but in design development, if that comes into play, that would be part and parcel of the trade-offs. That's where you start to get in design development saying, We can do this, this is the cost. Now you're going to have to adjust your budget or your program somewhere else in order to make it fit. I do think when you get into design development, most of those solutions will become apparent. But I would not agree with you that this is overly optimistic. I'm an experienced 25 year board certified hospital administrator. I have worked in over 50 critical access hospitals. And I'm quite confident and I wouldn't have put it out there. And I wouldn't have my firm spending the money because candidly, it costs us more to do this PAR, than we're going to be reimbursed. And I wouldn't have us planning on competing in a design build competition. If I didn't think you'd have the funding to do the project. Is it my opinion? Yes, I'd be happy to speak to the professionals at Trinity, or at St. Rose or anywhere else. If they would like to go over that information, I'm very confident that I can do that. And if that would make you feel more comfortable, I'd be happy to do so.”
Mr. Bruce Bruner interjects, “One additional item here for regarding those codes required for the rooms for operating rooms. I looked at the revision cycle while you were speaking Steve and their revision cycles next to be revised in 2022. For the recommendations for the classifications of the A, B and C. I've trying to question us, if you're looking at the California code requirements, which are changing their code requirements are on a different revision cycle because I don't see that necessarily applied in Nevada. Can you confirm with those Applicable to Nevada?
Dr. Van Le responds, “They’re applicable in Nevada because that's what Steve Berman used to inspect and assess and approve our plan.
Mr. Bruner comments, “So he did the California cycle codes, I'm just trying define the base.”
To which Dr. Van Le replies, “No. He says in Nevada he says in 2019 in Nevada was going to change to the new code. So then therefore he may just have too and Steve Burman is the only him and there's I think another gentleman, up North of Reno. They're the only two state inspectors that approves the plan. He's personally approved the plans and he yelled at the comments. So, we had to revise twice because we have to revise our architecture three times because once when we went when we move because of the square footage we had, once we revise the or size we have to revise other things. that comes with it, we have to shrink the number of pre op post op. Yes, I understand that correct? Yeah. Yeah. So those are the kind of things that we had to do. So one of the things that I am concerned about is if you are, if you're starting out, and you're not using the correct code, and you're using 2018 codes, and you're projecting your base, your construction, you're projecting on 2018 codes, versus the newer codes, and you go up there, I'm not saying that I know more than the gentleman that was speaking. But I'm just saying, I'm just raising these concerns, I've built two ASC, actually three, one in New York. And now the second one we're building out in Vegas, and I'm currently going to build another one in the state of Washington. And it seems like the building codes is the building codes. And then once it seems like that's what every state is saying is whatever our building code is. Medicare, Jayco, the joint Commission's when they come down, they basically you pass the state inspections and then the Jayco will come down and the Joint Commission will come down and review and go through the inspections on their own but usually they differ when it comes to building codes that differ to what the states require. That's what I was told. When I build my ASC.”
Mr. Steve Dailey interjects, “I think that's right, I do believe that's right. But remember, we're looking at the existing facility. In the codes we analyzed it at and we're programming based on square footage. We did not in the program that says discussion in June, talk about an OR doing orthopedics in fact my notes.”
Dr. Van Le clarifies, “No, we're not talking OR that use orthopedics we're talking about a general OR that could support any type of surgery because in there, in Tonopah when you feel the mindset would have to be game room or any space that you've built. In my opinion, it should be for multi-purpose for multi-use because we don't have the expenditures nor do we have the resources in terms of staffing to have specialties type of OR or specialty type. So it needs to be one that has to be consolidated, where the where it minimizes as much of a cost as possible. At the same time it serves a multi-purpose type of function.”
Trustee Gamble questions if Dr. Le is suggesting we adjust the program for the facility?
Continuing, Dr. Van explains, “No, I'm not saying you should adjust the program where what I'm concerned is when you submit this and let's say God forbid USDA or whoever it is the guy goes through and he comes through everything. And then he says, Hey, this is really, really unrealistic. PAR, this is something that is not, you know, so where do we where does that leave us? Where does that leave the people talking about in terms of you revenue, you're projecting the populations, okay. And you're using nine county populations, the largest population is Imperato for about 70% of the population. So when you projecting a 13% growth year to year in revenue, I mean it just it just even the CFO and he is an accountant. And he's like, I don't see it happening, man. I'm not seeing that. I'm not seeing 13% based on the assessment based on the populations based on the demand. Yeah, given the demand. And we talk about Long Term Care Reimbursement Long Term Care Reimbursement Medicare Medicare's fix, okay, you'd be lucky if you get if you get 5% increase every year. A Medicare if you're lucky. So the movers project a 13%. Okay, where are you going to get that growth of revenue?”
Mr. Steve Dailey responds, “One I would tell you is that when we put together that internal projection, we're looking at how growth occurs in brand new Greenfield hospitals.”
To which Dr. Van Le comments, “I understand that you're doing it and I look at the Ottawa, the one way you have in your attended the Ottawa, the population of Allah is 80,000. That's almost three times the population.”
Mr. Steve Dailey replies, “I understand your position. And what I will tell you is what we projected based on was a market share of approximately 16,000. We did not use the population of Tonopah alone. We base that based on our own analysis, as well as what that community health status analysis as well as a look at where zip codes show national hospitals in the past.”
Dr. Van Le inquires, “Let me ask you when you protect the 4 million and when you're projecting the numbers of visits to the ER, okay, how what does that number comes out to because my number costs about 11 visits a day, if you do a base on your number, okay, we're having 11 visits a day to the ER, the budget is not going to fly. Okay, and I don't know unless is a typical government thing where they don't care, but from a business and from a standpoint that down the road, who's going to bear the burdens of the overrun and overhead and the debt, based on analysis that is followed with the business policy and analysis of revenue.
Again, I want to reflect to you I'm not sure that the people you spoke with are familiar with critical access reimbursement. It is a colleague. They're not the hospitals are not licensed at the state level. Well, they're not federally. Let me ask you something, isn't it for builders their hospital? Desert Springs? Isn't that built by Valley Hospital isn't that started out as a critical part access of care, and they are still is designated a critical access. It still has the critical access and point of care. Valley Hospital; the gentleman Howard Dorsey is the one that negotiates the insurance. The good news is he's the CEO. And then also I know the former retired Valley CFO. And their basing it on Desert Springs and Desert Springs is still having problem to an extent financially. And given there's the 37% of Nye, almost 70% of Nye county populations is coming from Desert Springs and coming from Pahrump?”
In response, Mr. Steve Dailey comments, “That doesn't surprise me. Again, keep in mind, we have told we have recommended to you that you have an independent third party CPA firm, project out your finances based on the statistics that we have reflected for a critical access hospital that takes my opinion, what I have presented out of context and brings it back to yourselves, okay for your own evaluation. At this point, it's difficult for me to be placed on the defensive on a projection that is meant to be a sample, or an illustration of what the potential is for your organization. If the CPA firm does different, the program differentiates itself. Much like if you don't do orthopedics and if you don't do surgery, and you just do minor procedures, endoscopy, for example, then you don't need an OR at all. It there's a lot that isn't known yet. And I think what you're maybe mistaking is an attempt to give you a broad picture as something precise, it's not intended to be that and it says so right in the report.”
At which point Dr. Van Le inquires again, “I like to know the sources that the information are coming from. Because based on my own research and the sources that I can predict, it's like I told you the state code I gave you Steve Burman the state Inspector, he's the one that did the inspection on the hospital in Henderson on the valley. He's the one that approves the plan. He's the one that would do that. So when you giving me data, I like to know where the data is coming from and based on the population projections alone, I'm having a hard time wrapping my wrapping my head around the revenue. I'm having a hard time wrapping around even on the operation expense. I'll give you the operation expense. Okay, but somewhat the operation expense is unrealistic, because staffing, for instance, is almost 45% higher in terms of salary in Tonopah, then in terms of whether it's in Vegas, so I think if we were going to present a PAR to USDA or whoever it is that we're presenting to, I think that we have to we don't have to be 100% accurate, but we at least have to come to at least 5050. And I don't see a 5050 accuracy, you know, of those. So how are we going to sell something to somebody if they have an internal, somebody that inspects and I'm just playing devil's advocate there.”
Mr. Steve Dailey responds, “I appreciate your concern. I think what you're missing is you are going to have a healthcare CPA firm making the final projection to USDA. At this point, If the board decides, and we mentioned it early in the presentation, if you do a separate market analysis, you're welcome to do that. Mine is more conservative than the community health status done in a year ago, in terms of retention area and market share, that can be done. If that changes the number, it changes the overall, potentially the overall program or the project.”
Continuing, Dr. Van Le says, “So, so let me ask you this. You set the template, but you're saying that the template needs to be [Uninteligible] consultant to the board, you are being paid as consultant to give the assessment to give the template? Okay, and then now you're saying that let's go get some other expert. You're supposed to be the expert. You're supposed to be the one that comes up with the solutions. You are supposed to be the one that comes up with close to what the realistic what reality on the ground, supposed to be. Not one that just say, Hey, I'm just gonna give you one and say hey, you're more than welcome to get multiple support doesn't match. Based on what Karmin says earlier, they don't have infinite amount of money. So the expertise that you're providing them, what is the point? So that's, that's my conclusion is what is the point of your expertise when the projections is such an outlier? And the numbers such an outlier that it doesn't make sense?”
Chairman Greber interjects, “I appreciate you bringing these concerns forward. And they're on the record and we will review them closely. I know you have to go, at this point, I think that our board has a good understanding based on this exchange. And based on the presentation that we've heard, the platform that this presentations brings us to, I think we will be able to break all of these features into detail in the near future, and our meetings will continue. And certainly your concerns will stay top of the list and we will bear those in mind with all future discussions. Thank you. I know you have to go Thank you for calling in Van, I appreciate it. We'll be in in touch. Thank you.
Dr. Van Le exits the call due to a previously mentioned prior appointment.
The only thing I wanted to go over I'm, delighted with what you have provided. And I'm very comfortable with the level of detail that you provided and also the weight of experience and circumspect knowledge that you've brought to our board. I'm very happy that we've invested in your company to provide this foundation for us to understand the design build process and to move forward. The timeline is, of course, I'm have been called hasty before. I'm I think the timeline is reasonable based on the challenges with Office staffing at various levels and travel and etc, that we all face, which is a current reality and who knows what it will be like in the next 12 and 24 and 36 months. My questions were very simply the programming itself. Overall, I'm looking at pages five through seven, wherever that was the program elements, can you without having to go through each one, It sounds like you were able to incorporate our priorities from the June meeting, you feel comfortable that you're able to incorporate all of those or is there any that are omitted or altered? Mr. Dailey answers, “I believe based on the notes that I took at that meeting, that I covered them, I will note, I did not put a full size OR in, I put procedure room and I questioned the need for an OR as but one example. But yes, I believe the issues that we covered are there. Do I think it could be smaller? I'll come back. I told you that June with my original program that I thought it could be smaller. I would, and I think in fairness to my own organization, we are certainly nor is any design builder, going to submit drawings to the state that do not meet and are not code compliant. And I just, I leave it at that that's the mark of a qualified healthcare architect. And I would submit, if anecdotally that hasn't happened in this gentleman's experience, it may be that he needs to find himself a different architect, I will be very blunt.
Chairman Greber acknowledges the response, and opens the floor for any issues the Trustees would like to address during the meeting today.
Trustee Gamble questions if there is a difference between the codes that would be required for a ambulatory surgery center versus a critical access hospital.
Bruce Brunner responds, “Yes, there, there will be some minor differences because what you’re going to be facing as the required care and recovery spaces, the amount of associated support services within that. What you'll find that within an ambulatory surgery center, you will do, you will not have the requirements for food you will not have the requirements for some of the nutrition areas you'll have the mental space inside these the supporting spaces. The actual functional spaces for an operating room and for recovery for phase one and phase two should be almost identical between that type of facility. You'll see minor differences on that and each state will have a variance of what they may require for ambulatory surgery centers when you follow those guidelines. So overall, the requirements for an operating room will be the same the requirements for those individual room types should be the same. But you will find a minor variances within that is for the additional support spaces. So for a full hospital, we do have to provide a few additional services and operations because we have to have 24 hours.”
Mr. Stephen Daily comments that depending on the usage of vours, they can dramatically change not only with size, but square footage.
Mr. Bruce Brunner interjects, “I was looking at different types of ORs a standard small OR about 350 square feet for the minimum OR. What you're seeing is a variance between different zones for a class A Class B and Class C OR. A Class C OR you're looking at something as large as 800 square feet a Class B varies between 450 to 600 or more square feet. And the Class A is like the minimum of 350 to 450 or so square feet. For the type of procedure being done within that.”
Trustee Gamble comments, “Then for your revenue projections, and including in the cost of construction, we never made any allowances for things like the FCC grants that would include IT infrastructure and electronic healthcare and stuff like that. We there was no allowances made for those. So anything that we did get would just add extra and reduce the cost.”
Mr. Dailey confirm that is correct, presuming projected governmental appropriations is lower than the Board currently already has.
Trustee Gamble mentions, “I want to be fair here. I understand his nervousness and his concern. And yourselves. If we ended up your partner here, ourselves, you know, we're not there to build a hospital walk away and have it fail. Okay? And I again, I'll say it again, I am putting my reputation on the line with my company saying you have the money to do this, to do a project like this, or I expect you to be able to do that. I'm unable to respond to what someone told him. Second hand or third hand, I'm not in a position to address someone in that circumstance. But I'm happy to sit down with anyone like that and learn from them. And listen And frankly, design development is going to this is what design development is gonna be. Typically in a physician owned and operated, the physician dictates This is what I want. That's what that's what gets accomplished. This is going to be a matter of what is the possible, you actually heard me say earlier on, you may end up with outpatient departments and emergency departments. And phase two is, you know, those are things that you have the ability to do during your design development process. The idea that someone comes in, in a design build competition with even if they win with that design, or that solution that they come up with, that may not be what you do in the long run.”
Mr. Steve Dailey continues, “I clearly heard some, some comments lacking in understanding have critical access reimbursement. But on others I heard he talked to experts within critical access. But again, then what was the mix? He said this is high Medicare. High Medicare is why you do critical access, right? Someone has, in Pahrump for example, I don't know what their market share is, if it's 50% Critical Access is a ticket to the poorhouse reimbursement status, for example, where you want Critical Access reimbursement is where you're going to be advantaged by that 101.5% of cost formula.
Trustee Gamble questions if that number increases, because it was a congressional delegation when they made the “critical access deal”. “That 101.5% only goes up with one another .7-.5 something like that with a Jayco certification being it as well correct?”
Mr. Dailey answers, “Well, JAYCO is separate. That's typically where you get into reimbursement with a third party. I worked as a consultant for Blue Cross, where they where they offer a higher reimbursement for their patients. If your joint commission accredited, right as an example, but if you're just high Medicare, you don't have to have, Joint Commission accreditation. It's not cheap, right?
In order to have it. But if you're in a commercial market where it makes sense financially to do it, or it helps you with the marketing edge, then I would do it. But I would tell you what I'm aware of at least 70% of the critical access hospitals are not joint commission accredited, right? Most choose to say CMS is enough. And that satisfactory, and again, even with the code issues here, you're going to get into what is a state issue and what CMS says and what code CMS requires for critical access versus the state. And that's gonna get sorted out in the design process. That's part of the research that goes on in that process. But I understand I want to be sensitive, from everything I see. This is accomplishable it is as accomplishable as, this is programmed? I don't think we know yet.
You know, and it there are going to be compromises or maximum maybe you want to maximize outpatient reimbursement versus inpatient. That happens along the way. But what I also will tell you is a new critical access hospital doesn't get stuck in, okay, I got 3.5% or I got 5%. This year, they get a new rate. And that new rate is based on what that facility cost.
So if the facility costs $20 million, and the mortgage payment on that $20 million is a 40 year USDA loan in the end that's a million and a half dollars. And you're 100% Medicare, which you're not going to be, then your mortgage is paid, you're being paid your cost to operate that facility plus one and a half percent.
Trustee Gamble comments that figure doesn’t necessarily include additional ancillary services that may be developed along the way.
To which Mr. Dailey responds, “Correct. So it is, that's where having the expert that can lay it out, we are a construction company. I'm a health planner. I'm looking at what I think you need, and and what I believe you should be aiming for. It may be more modest than this, or maybe it doesn't have to be and but you're going to do better. When a third party healthcare company, CPA comes in and says this is what we see.”
Trustee Gamble affirms that is the next step, prior to doing the design build competition. He asks if this can be accomplished simultaneously.
Mr. Bruce Bruner answers that is can be done simultaneously. USDA is going to want it as part of the application. Mr. Dailey states, “I heard clear concern on his part that the market share isn't going to be adequate. And he referenced Tonopah as opposed to Nye County, well, I used 16,000, your health status report, used 19 and 20,000 as your catchment area, and then I used a percentage of that I didn't take 100% I took for inpatient, I took 35%. That is what I utilized for projection purposes. It served me fairly well over a fairly long period of time. To look at it that way. That's what I have assumed. If this urgent care which now advertises emergency medical services, 24/7. You may be 2000 in ED, right. I wouldn't be afraid of 11 patients in an ED. I. Bruce, you just finished a hospital in Parkview. Parkview in Wheeler Texas. That has what 1200 Ed visits a year.”
Mr. Bruce Bruner affirms is was minimal; that there were four exam rooms, but no operating room within that facility. It's just a procedure room.
Mr. Steve Dailey states, “There so there are opportunities in this process for all sorts of trade-offs. And if it's cheaper for the community, the users and care, they will figure it out pretty fast. If that's, they're going to do that. But what I see what I see in practice, is I see both were on the hospital campuses.”
Trustee Gamble interjects, “I would also submit to to you guys as well that we've seen some kind of ups and downs with the clinic historically that a hospital might actually be completely differently viewed in the public, as opposed to a clinic, which may increase visits over what the clinic has been just because it says hospital and that's what everybody was used to nobody, nobody was really used to the clinic idea in town.”
Mr. Steve Dailey continues with, “You could take those projections, and you could take it at 4%-7%. But actually, I see new facilities grow robust until about year four or five. And when people try it out. If they like what they see, the growth, the growth and the strat and begins to develop. It also assumes that you're gonna have your own medical staff. Right. And that, you know, hopefully, you get someone that in essence, wants this to be their shingle wants this to be their community and they bring a spouse and a family and tie themselves in. That typically, I would tell you, if you hired me tomorrow as the hospital administrator, if you don't have that your hospital won't fly. If you keep bringing people in here on an itinerant basis for three or four days a week, it's not going to give you a hospital, you need the functioning hospital that Karmin, we had some discussions that you remember. And that's what works in small communities. That's what makes them survive.
That's gonna be very difficult to have, say, a turnkey staffing agency type of setup with that, as opposed to an own employee type of. You will need somebody that makes this, you're probably going to use an income guarantee, and somebody who is someone who comes in, they may say I want to be backed up with employment, or whatever, but you want someone that isn't here to fulfill. Ideally, they're not here to fulfill their national health service requirement and they gotta bail. Right? You want someone that's going to make this their community. With a new hospital, and so forth, that's something that it's job number one for whoever you have run the facility. They're going to be a recruiter, they're going to use recruiters, but they're going to be recruiter. Their job is, is to find the linchpin. And that's something that I will tell you in today's world. A lot of administrators just love employing physicians, and that's what they do. And what happens in practice is the employed physician does 40% sees 40% less patients in their office than the employer, the physician that's on their own, which means your community has less access to care. And they are not the person that shows up if we ever have them again, football games, soccer games, basketball games, and so forth. You want someone that, if there's if there is an inpatient patient, they're going to see him in morning before they have office hours. Then because this may not be the most How do I say this this may not this may not be the community where they are going to be occupied with things wall, to wallet at night that they're going to go home and have dinner and then walk through back, see their patients again, they'll do rounds twice a day instead of once, because that's the kind of care you get. But that's what works in a critical access hospital setting. And that's what you look for on a long term basis. Absent that, yes, you're going to have if you're a physician, and you're used to managing other physicians, and you're doing it as on agency basis, you're not going to see that kind of allegiance from patients. You're not going to see that kind of growth. That's not what happens. But right now. That's your best bet. Right? That's, that's clearly what you have now. You don't want to throw out the baby with the bathwater. This gentleman, this gentleman needs input. If I were to do it again. I regret that I didn't get to sit down Listen to him for five hours before I did a report and I'll admit that right now, it would have saved you this today. Alright, and I'm gonna blame myself for that.” Mr. Steve Dailey concludes by asking the Board if there are any further discussion points or questions?
No further discussion is had concerning the PAR. Trustee Kaminski states he feels the first part of the presentation was redundant, because he believes the Board is convinced on how to proceed with facility.
Trustee Gamble expresses his pleasure at having it proven on paper by somebody else other than us to say that it just needs to go.
Mr. Steven Dailey anecdotally comments, “It's the old story, call up your lawyer or walk into him on the supermarket and say, Hey, can I do this? He will give you the answer. You want it in writing, get out your checkbook.
Chairman Greber comments, “Certainly that's the reality. Well, and as you said, these are all boxes to check for proper funding and understand that completely. And that was my motivation two years ago, to start getting these things assessed by third parties credentialed third parties was with the aim in mind of being prepared to push all the data points that we can to the interested parties for the design build or to the USDA, all of those things, the more robust our legwork ahead of time and the credentials of our partners such as Korte, the better our chances.”
As an aside, Mr. Steven Dailey states, “Something I realized because I'm on a I'm up at 5am in the morning. So you can imagine in that's a central time so you can imagine when I was up this morning, looking at the sky and driving around neighborhoods and so forth. You can't have a blue hospital blue sign with white letters of a hospital H on it right now. I would strongly recommend you have a sign with that color scheme that says urgent care and put it at both ends of the community of a town so that their urgent care center captures drive- throughs everybody in town knows it's there. But for your drive-throughs your to your tourist population and so forth. Even the new sign is not very visible. Maybe it is even at night it's it was dark when it's not very visible and something that people see coming into town might be very valuable. It only takes one patient to pay for the sign. And I would I have made this recommendation countless times to hospitals with blue just put them everywhere. When you're into your hospital. It only takes one and in the case of hospitals, it only takes one vehicle accident to come into the emergency room. Think like a hospital administrator. Oh, forget BlueCross forget Medicare, forget Medicaid, car insurance that pays that pays that pays charges. But in your case, making that urgent care more visible is in your best interest. It's in everybody's best interest. And you don't have it, they don't cost very much. You can have it cost, you can probably have to have it custom made. But you can, you know, I think it would be beneficial for you to because you've got a resource there.”
A discussion ensues concerning this concept, including Trustee Kaminski affirming the Board has been trying to work on billboards. Chairman Greber recommends an icon of some kind. Mr. Dailey suggests a sign with a similar blue background that just says Urgent Care Monday through Friday at whatever, as Saturday and Sunday is such and such. Trustee Gamble suggests a DOT type sign, which he feels are relatively inexpensive.
Mr. Steven Dailey moves back to the matter at hand with, “That's an aside but he's the incubator. His clinic is the incubator for your hospital, the higher volume he's get if he steals two thirds of your ED volume. So what? That's gonna drive out patient volume that's going to drive referrals. Those are the things that are going to get you off the ground as an as an organization, and it's a lot of little things. If you wish me to have telephone conversations with any of the individuals he referenced, I didn't write down names. I'm happy to have them. You know, the object here is not to pull the wool over your eyes or send you in a wrong direction. If I didn't think you could support a hospital, I would have told yourself. Now and I would have been, “Here's your report”. I don't see that. I'm giving you my own opinion, and it is couched in the Korte Company's reputation as well. But I do not see. I see the caution that he has. I do not see the fear that he was engendering there. You have you have a good shot. I think I said it in June. It's better than 50%. And that's a very good, that's, that's where you want to be. And getting this off the ground and done. Exactly how your final program will be.”