"Valley Electric" at county meetings
Search what was said at these meetings Beta
Type a topic, a road, a company or a name. Get back who said what, meeting by meeting, with a link to the minutes and the recording.
This is new, and it runs on new software, so it will not be perfect yet. Where the county has posted minutes, the words and names are the clerk's. Where it has not, the words are our transcription of the county's video, made by software: it can mishear a word, a name or a number, and speakers are shown as letters, not names. Please double check anything you rely on against the minutes and the recording, which are linked on every page.
Right now it covers 748 meetings, from July 9, 2012 to August 18, 2026: 740 from the county's minutes with the speaker named, and 8 from our own transcript of the recording, where the county has not posted minutes yet and speakers are not named. More are coming.
172 turns across 98 meetings.
Board of County Commissioners, August 18, 2026transcript of the tape, speakers not named
Item 22: For Possible Action – Discussion and deliberation regarding a request to set a date, time and location for a Public Hearing on Nye County Bill No. 2026-14: A Bill proposing to amend Chapter 17.10 of the Nye County Code to establish land use regulations, special use permit requirements, and development standards for Data Centers and related infrastructure by amending Section 17.10.010: Definitions, Section 17.10.020: Purpose and Intent, Section 17.10.050: Requirement to obtain a special use permit; and by adding a new Section 17.10.055: Data Center special use permit requirements; and providing for the severability, constitutionality, and effective date thereof; and other matters properly relating thereto.Watch this item
- Voice Fat 4:45:24...You cannot calculate a data center's water without its electrical capacity because water use is figured from power. Mance has never stated capacity. So that figure cannot be verified...
- Voice Jat 5:17:05...Increasing electric and water bills despite assurances to the contrary. Humongous compounds with walls up to 95 feet tall will not only destroy the beauty of our valley, but also...
- Voice L2at 6:18:09...The equipment, power density, cooling requirements and electrical demands of data centers 10 or 20 years from now may look very different from what's being proposed today. What prevents...
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, August 4, 2026transcript of the tape, speakers not named
Item 6: 10:00 a.m. - For Possible Action - Public Hearing, discussion and deliberation regarding a request to adopt, amend and adopt, or reject Nye County Bill No. 2026-11: A Bill amending Nye County Code Title 17, titled Comprehensive Land Use Planning and Zoning, by creating Chapter 13, titled Data Centers, to provide for a prohibition; effective date hereof, and other matters properly relating thereto.Watch this item
- Voice Cat 1:27:18...We have been able to use some Valley Electric goodwill, some funds that were offered for other reasons in order to get power to a shooter site. We've been...
- Voice Jat 1:39:24...all usage of corrupt valley currently these numbers are only for the cooling system doesn't even include the water uses needed for the electricity for the data center and...
- Voice H2at 3:00:46...If you've seen the news reports about data centers around other parts of the country, you'll know that they constantly emit loud screeching noises from multiple electrical electrical...
Item 25: For Possible Action - Discussion and deliberation to: a. Approve, amend and approve, or reject the Broadband Infrastructure Construction and Right-of-Way Access Agreement between Nye County and Stimulus Technologies of Nevada LLC, in substantially the same form and substance as presented; and b. Execute the agreement.Watch this item
- Voice Lat 9:23:08...All other providers, Valley Electric, Optum, AT and T, all the other service providers that have broadband infrastructure per the AB seven zero nine will have to enter in a...
- Voice Lat 9:26:46...Valley Electric, Optum, any other service provider that's offering broadband service will have to enter these franchise agreements with the county and pay the you know, this franchise fee...
- Voice Rat 9:36:30...I know Valley Electric is having problems right now, and they they're trying to get encroachment permits or something else to drill underneath the streets. I know this because...
- Voice Iat 9:38:34...On the same problem that we have had with Valley Electric, they have been way more responsive with that and gone back and forth with us about fifteen, twenty times...
- Voice Lat 9:45:59Valley Electric, Optimum, AT and T, they're already accessing the right of ways. And they've got those permits prior to this being a requirement per NRS seven zero...
- Voice Bat 9:47:48...It's fiber because Valley Electric's not gonna get out to the far reaches, and this is where these guys are planning to go. So so I have a...
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, July 21, 2026transcript of the tape, speakers not named
Item 3: GENERAL PUBLIC COMMENT (Up to three-minute time limit per person) Public comment will be for all matters off the agenda. Public comment must be limited to matters that are within the jurisdiction and control of the Board of County Commissioners. Action will not be taken on the matters considered during this period until specifically included on an agenda as an action item (FIRST).Watch this item
Item 24: GENERAL PUBLIC COMMENT Up to three-minute time limit per person) Public comment will be for all matters off the agenda. Public comment must be limited to matters that are within the jurisdiction and control of the Board of County Commissioners. Action will not be taken on the matters considered during this period until specifically included on an agenda as an action item (SECOND).Watch this item
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, July 7, 2026transcript of the tape, speakers not named
Item 12: 10:00 a.m. - For Possible Action - Public Hearing, discussion and deliberation to adopt, amend and adopt, or reject Town of Pahrump Bill No. 2026-02: A Bill adding Chapter 26, titled Data Centers, by adding Section 26-1 titled Purpose and Findings, Section 26-2 titled Definitions, Section 26-3 titled Prohibited Uses, Section 26-4 titled Applicability, Section 26-5 titled Prohibition on Circumvention, Section 26-6 titled Preexisting Uses and Approvals, Section 26-7 titled Enforcement and Violations, and Section 26-8 titled Administrative Appeal and Relief; and providing for Severability, Constitutionality and Effective Date thereof; and other matters properly related thereto.Watch this item
- Voice Dat 5:06:46...Valley Electric cannot tell me their current available capacity, just that it will take three to six months to process an application. VEA doesn't really produce any power. They...
- Voice Oat 5:27:13...These numbers are only for the cooling systems, doesn't include the water usage needed for the electricity for the data center and for the construction. Data centers on the...
- Voice Zat 5:45:41...Perump is a rural value valley with limited water and strained electrical grid, and a neighborhood built on quiet, open space and data center threatens all of that. Data centers...
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, June 18, 2026transcript of the tape, speakers not named
Item 2: GENERAL PUBLIC COMMENT (Up to three-minute time limit per person) Public comment will be for all matters off the agenda. Public comment must be limited to matters that are within the jurisdiction and control of the Board of County Commissioners. Action will not be taken on the matters considered during this period until specifically included on an agenda as an action item (FIRST).Watch this item
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, June 2, 2026transcript of the tape, speakers not named
Item 2: GENERAL PUBLIC COMMENT (Up to three-minute time limit per person) Public comment will be for all matters off the agenda. Public comment must be limited to matters that are within the jurisdiction and control of the Board of County Commissioners. Action will not be taken on the matters considered during this period until specifically included on an agenda as an action item (FIRST).Watch this item
- Voice Aat 0:38:00...That's on a Monday from 4 to 6.30 at Valley Electric Conference Center. We're inviting everyone to come out and show that support for this upcoming charter...
- Voice Lat 0:39:10Again, the open house is going to be at the Valley Electric Conference Centre on Monday, June fifteenth, and we're inviting everyone to come out. It's gonna be...
Item 15: For Possible Action ? Discussion and deliberation to place a moratorium against accepting applications for any data center or anything associated with a data center until such time as an ordinance is created and approved by the Board of County Commissioners to regulate said facilities.Watch this item
Item 24: Presentation by Nathan Whittcare, regarding the expansion of Stimulus Broadband's fiber Internet Services into Pahrump, NV. Construction is beginning this summer and will deliver speeds up to 2500 Mbps to businesses and residents. (5-minute time limit)Watch this item
Source: our machine transcript of the county's recording. No minutes posted yet. Check the tape before quoting.
Board of County Commissioners, April 21, 2026
Source: the county's minutes (PDF)
Board of County Commissioners, March 17, 2026
Source: the county's minutes (PDF)
Board of County Commissioners, January 21, 2026
Item 35: For Possible Action Discussion and deliberation to recommend a course ofWatch this item
- From the minutes...Clark County has already screwed up the southern end of the valley by allowing these solar farms to be built. We have a couple here in the valley that want...
- From the minutes...Amargosa Valley, NV, 10640 E US Highway 95, Amargosa Valley, NV, 8070 N Test Site Rd, Amargosa Valley, NV, 3155 W US Highway 95, Amargosa Valley, NV, 0 Fleur De...
Source: the county's minutes (PDF)
Board of County Commissioners, January 6, 2026
Source: the county's minutes (PDF)
Board of County Commissioners, November 18, 2025
Item 12: For Possible Action Discussion and debate to approve to set aside $35,000.00Watch this item
Source: the county's minutes (PDF)
Board of County Commissioners, October 21, 2025
Source: the county's minutes (PDF)
Board of County Commissioners, October 7, 2025
Item 17: For Possible Action Discussion and deliberation to:Watch this item
- From the minutes...Approve, amend and approve, or reject a Memorandum of Understanding (MOU) with Nye County, the Town of Pahrump, and Valley Electric Association, Inc. for the development of electrical and telecommunications...
- From the minutes...Part of the fairgrounds going forward and having the support of Valley Electric to help us with the infrastructure is really important. We’re five years in now on getting...
- Dr. Mitch...If you want to know where Valley Electric is going to get the money, then you need to be sitting at a Valley Electric meeting. Not complaining to the town...
- Commissioner Strickland...Today, you are only voting on the infrastructure and Valley Electric has donated the money. Who’s putting the infrastructure in? The early 2000’s, the BLM had donated this...
- Commissioner Koenig...I was told that Valley Electric had done the MOU quite some time ago and we were kind of stuck with it.
- Commissioner Strickland...Of course, I’m scared to death to change the MOU in any fashion because ofthe commitment that valley electric has already done by going to their board. I’ll...
- Commissioner Bayne...The priority that we’ve discussed with valley electric has been a possible new arena, soccer fields, finish the OHV park, the lighting, and all of that stuff. The Civic...
- Commissioner Bayne...Over the past six months county staff has expanded upon the discussion and committee outreach done by Valley Electric’s formal legacy committee. Staff has worked with Valley Electric board...
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, September 10, 2025
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, July 9, 2025
Source: the county's minutes (PDF)
Board of County Commissioners, June 3, 2025
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, May 14, 2025
Source: the county's minutes (PDF)
Board of County Commissioners, April 15, 2025
Source: the county's minutes (PDF)
Regional Transportation Commission, March 19, 2025
Item 0: Attendance
- Mr. Bolling...Beau also stated that Valley Electric changed most of the lighting to LED. Beau doesn’t think they are as bright.
- Commissioner Koenig...GENERAL PUBLIC COMMENT: (second) Doug Blackstock stated that maybe we could get with Valley Electric and let them know that we need a higher wattage bulb. He also thinks that...
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, February 12, 2025
Item 31: There is a current waiver of the minimum separation requirement already in place on the property and a new
- Mr. Whittamrestated GridLiance and Valley Electric are connected. Valley Electric provides the services and he will let Valley Electric speak on behalf of themselves. Location is not an issue tonight. The...
- Commissioner O’Brienasked what the route will be to tie in with the Valley Electric substation in 160 and Industrial?
Source: the county's minutes (PDF)
Board of County Commissioners, January 22, 2025
Source: the county's minutes (PDF)
Board of County Commissioners, December 17, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, December 3, 2024
Item 17: Nevada is the 50th ranked, tied with Washington, DC, in unemployment. Now,
- Commissioner Strickland...mile of power Board of County Commissioners Minutes — 12/03/2024 Page 27 line to connect to the power line that Valley Electric sold that the County had control of.
- Mr. O’Brien...Mary Kay Radcliffe did not see how the people from the solar and electric companies with all of their studying found this was a fair thing for the citizens. Also...
Source: the county's minutes (PDF)
Board of County Commissioners, October 15, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, August 20, 2024
Source: the county's minutes (PDF)
Nye County Water District Governing Board, August 13, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, July 16, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, June 18, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, April 2, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, February 16, 2024
Source: the county's minutes (PDF)
Board of County Commissioners, November 21, 2023
Item 8: 10:00 am. For Possible Action Fiscal Year 2024 Community Development
- Commissioner Coxsuggested communicating with Valley Electric to see if they would like to be community partners and fund whatever was needed to finish the project for the water and the well...
- Commissioner Carboneclarified the Board was not voting for Valley Electric to do anything. They were trying to set the priorities.
Source: the county's minutes (PDF)
Board of County Commissioners, August 15, 2023
Source: the county's minutes (PDF)
Board of County Commissioners, May 2, 2023
Source: the county's minutes (PDF)
Board of County Commissioners, April 18, 2023
Source: the county's minutes (PDF)
Board of County Commissioners, March 21, 2023
Source: the county's minutes (PDF)
Board of County Commissioners, January 3, 2023
Source: the county's minutes (PDF)
Board of County Commissioners, December 20, 2022
Source: the county's minutes (PDF)
Board of County Commissioners, September 7, 2022
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, August 31, 2022
Source: the county's minutes (PDF)
Board of County Commissioners, August 16, 2022
Item 41: For Possible Action Discussion and deliberation regarding Nye County
- Commissioner Cox...1) Consider granting a Right-of-Way Easement to Valley Electric for a Transmission Line project located on Assessor’s Parcel Numbers: 021 -21 8-02; 021-224-02; 021...
- Commissioner Strickland...1) Consider granting a Right-of-Way Easement to Valley Electric for a Transmission Line project located on Assessor’s Parcel Numbers: 021 -21 8-02; 021-224-02; 021...
- Commissioner Blundo...1) Consider granting a Right-of-Way Easement to Valley Electric for a Transmission Line project located on Assessor’s Parcel Numbers: 021 -21 8-02; 021-224-02; 021...
Source: the county's minutes (PDF)
Board of County Commissioners, July 19, 2022
Item 43: For Possible Action Discussion and deliberation regarding a request to: 1)
- Commissioner Blundo...1) Consider granting Right-of-Way Easement to Valley Electric for Transmission Line project located on Assessor’s Parcel Numbers: 021-218-02; 021-224-02; 021- 227-02; 021...
- Commissioner Carbone...Bob Sweetin, appearing on behalf of Valley Electric, said they were amenable to what the Board desired.
Source: the county's minutes (PDF)
Board of County Commissioners, July 5, 2022
Source: the county's minutes (PDF)
Board of County Commissioners, December 16, 2021
Item 7: 10:00 am. Presentation by Nicholas Pay with the Bureau of Land
- Mr. Pay...In Pahrump it seemed to be driven by the California ISO grid and the Valley Electric system. He said where the power went and how that worked was not necessarily...
- Commissioner Strickland...They learned Grid Liance was the cooperating entity with Valley Electric that built the transmission receiving substations and there were two in the valley floor, one in Trout Canyon and...
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, September 15, 2021
Source: the county's minutes (PDF)
Board of County Commissioners, July 20, 2021
Source: the county's minutes (PDF)
Regional Transportation Commission, January 27, 2021
Source: the county's minutes (PDF)
Board of County Commissioners, July 21, 2020
Source: the county's minutes (PDF)
Board of County Commissioners, February 19, 2020
Source: the county's minutes (PDF)
Board of County Commissioners, September 17, 2019
Item 36: For Possible Action - Discussion and deliberation regarding approval of a
- Commissioner Wichman...That group came up with a design, but Valley Electric then had some internal issues and discussions fell apart. Valley Electric representatives had approached Mr. Sutton to see if the...
- Commissioner Wichmanagreed and suggested having staff work on the coordination instead of waiting for someone at Valley Electric to come up with good ideas on the County's behalf.
- Commissioner Strickiand...Valley Electric just wanted the plan agreed on. Dave Stevens told the Commission to not deal with Valley Electric Association and reminded everyone about the swimming pool they promised.
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, September 11, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, August 6, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, July 16, 2019
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, July 10, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, June 18, 2019
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, April 10, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, March 19, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, January 23, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, January 7, 2019
Source: the county's minutes (PDF)
Board of County Commissioners, September 4, 2018
Source: the county's minutes (PDF)
Board of County Commissioners, May 15, 2018
Source: the county's minutes (PDF)
Board of County Commissioners, April 3, 2018
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, March 14, 2018
Item 7: Ex Parte Communications and Conflict of Interest Disclosure Statements
- Commissioner Adams...set up or anything be done within 10 feet of Valley Electric fence, no signs be put on Valley Electric fence or poles, adding port-a-potties be allowed based...
- Commissioner Leestated she will second if Commissioner Adams amends his motion to include the two conditions from Valley Electric that were left off. #15 there shall be no blocking of the...
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, January 10, 2018
Source: the county's minutes (PDF)
Board of County Commissioners, December 19, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, August 15, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, July 18, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, June 28, 2017
Item 14: For Possible Action Discussion and deliberation on proceeding with the
- Commissioner Borasky...Butch Capel from Valley Electric confirmed they were looking at doing something like that. He said they were hoping with this concept with the water coming out of the rock...
- Commissioner Cox...She said this was one of the few landmarks and no disrespect to Valley Electric but the design looked like it belonged in a city hail. She knew there was...
Source: the county's minutes (PDF)
Board of County Commissioners, May 16, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, April 18, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, March 21, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, January 17, 2017
Source: the county's minutes (PDF)
Board of County Commissioners, November 1, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, October 12, 2016
Item 5: Presentation by Valley Electric Association, Inc. regarding the sale of the 230kV
- Mr. Hustedgave a Power Point presentation regarding their project entitled “A Path to the Future,” which provided the history of VEA and their original transmission system loop as well as the...
- Commissioner Schinhofenpointed out VEA just had an increase and now they were proposing to roll it back.
- Mr. Hustedsaid it was a 9.9% increase that they were rolling back. This would give them the ability to do that but still meet short term and long term obligations.
- Commissioner Carboneasked if the power requirements for the current stakeholders wouid ever be lacking.
- Mr. Hustedsaid no and they would have a more robust system as it expanded.
- Commissioner Borasky...Presentation by Valley Electric Association, Inc. regarding the sale of the 230kV Transmission Line.-Cont’d.
- Mr. Hustedsaid absolutely and it was actually a 25 year operations and management agreement.
- Commissioner Boraskynoted on solar projects that quite often the Governor took the taxes the County would get away and give them a free ride on it. He asked for Mr. Husted...
- Mr. Hustedstated ancillary tax benefits had to be included in the calculations so if there was a large development put outside of town and the tax incentives were such that the...
- Commissioner Schinhofenmentioned it was announced that the Solar Reserve Crescent Dunes project was planning to do nine more towers so an expansion out of Bishop may help that too.
- Mr. Hustedencouraged the County to vote in the affirmative for the sale as he believed the County would be impacted very favorably by it. An affirmative vote of 66% of their...
- Commissioner Coxasked how long the 9.9% rollback would be in effect and what would cause it to be cancelled and raised.
- Mr. Hustedsaid their forecast right now was another eight years minimum, which would give them a 14 year time span of the rates at 10.9 cents.
- Commissioner Coxasked if the customers would still be billed directly through Valley Electric.
- Commissioner Coxasked if the long-term rate sustainability would be good for at least 20 years.
- Mr. Husted...Presentation by Valley Electric Association, Inc. regarding the sale of the 230kV Transmission Line.-Cont'd. be with this proposed sale. On average a residential member would get between $250...
- Mr. Hustedsaid all of those things were yet to be determined.
- Commissioner Coxthen asked Mr. Husted if it was true that he would receive a $12 million retirement amount out of the sale then leave in a year and a half.
- Mr. Hustedstated that was not true. He received the same incentives that all members did. He would receive $579.00 and a retirement of patronage capital, and there were no special...
- Commissioner Schinhofenwas not present.
Source: the county's minutes (PDF)
Board of County Commissioners, October 4, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, September 6, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, August 16, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, July 19, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, June 21, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, February 16, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, January 5, 2016
Source: the county's minutes (PDF)
Board of County Commissioners, December 1, 2015
Item 27: For Possible Action Discussion and deliberation regarding: 1) Presentation
- Commissioner Borasky...He was working with the husband and wife team that brought it forward and a private individual had also been contacted to work with Valley Electric. Regarding the bulletin boards...
- Commissioner Carbone...Susan Gresham added they had requested Valley Electric provide those numbers to see how they came up with them, but they had not been successful. She noted the original quote...
Source: the county's minutes (PDF)
Board of County Commissioners, October 6, 2015
Item 43: For Possible Action Discussion and deliberation to consider and make a
- Commissioner Carbone...The only option would be to deny it today and negotiate further with Valley Electric and the developer so they could come back at a future date and apply for...
- Mr. Brooks...to the project so there would be no change orders or cost impacts to Valley Electric. He expected to use people almost exclusively out of Pahrump for materials and services...
- Commissioner Wichman...For Possible Action Discussion and deliberation to consider and make a recommendation to the Director of the State of Nevada Governor’s Office of Energy on the Nevada Valley Solar...
Source: the county's minutes (PDF)
Board of County Commissioners, September 15, 2015
Source: the county's minutes (PDF)
Board of County Commissioners, June 2, 2015
Source: the county's minutes (PDF)
Board of County Commissioners, February 3, 2015
Source: the county's minutes (PDF)
Board of County Commissioners, January 20, 2015
Source: the county's minutes (PDF)
Board of County Commissioners, January 5, 2015
Source: the county's minutes (PDF)
Board of County Commissioners, December 16, 2014
Source: the county's minutes (PDF)
Board of County Commissioners, November 12, 2014
Item 50: For Possible Action Discussion and deliberation regarding a request to set a
- Commissioner Boraskyasked if streetlights were under Public Works or Valley Electric since he wanted to report two of them that were out. Mr. Fanning said those should be reported to Public...
- Mr. Fanningadvised Valley Electric had worked on the program for almost nine years now and they had not increased their rates. That was something that could be looked at and assessed...
Source: the county's minutes (PDF)
Pahrump Regional Planning Commission, October 29, 2014
Source: the county's minutes (PDF)
Board of County Commissioners, September 2, 2014
Source: the county's minutes (PDF)
Basin 162 Groundwater Management Plan Advisory Committee, June 23, 2014
Source: the county's minutes (PDF)
Board of County Commissioners, April 22, 2014
Source: the county's minutes (PDF)
Board of County Commissioners, April 1, 2014
Item 33: For Possible Action Discussion and deliberation regarding the: 1) Clean
- Commissioner Wichman...He suggested that since the pole line had been there at last 40 years there was already an easement in favor of Valley Electric and whatever rights the phone company...
- Commissioner Schinhofenopened the public hearing. Mark Duvall from Valley Electric advised they did not find an easement already existing for the property.
Source: the county's minutes (PDF)
Board of County Commissioners, March 18, 2014
Source: the county's minutes (PDF)
Nye County Board of Equalization, February 13, 2014
Source: the county's minutes (PDF)
Board of County Commissioners, December 4, 2012
Source: the county's minutes (PDF)
Board of County Commissioners, September 4, 2012
Item 91: For Possible Action Approval to purchase a Dodge pickup truck for the new
- Commissioner Boraskysaid he questioned some of the language in the letter regarding the electrical need for the existing line and that Valley Electric will “likely” accommodate its removal, and that the...
- Commissioner Eastley...For Possible Action Approval to grant Valley Electric Association, Inc. (VEA) a 100 foot easement and right of way across County owned property (APN 035- 011-01) that includes the...
- Commissioner Schinhofenagreed with the amendment but was concerned with Valley Electric’s current intention with regard to the existing line. He seconded the motion because he thought this was a good...
Source: the county's minutes (PDF)